EN
10
Operating manual – dehumidifier / climate manager DH 30 VPR+ / DH 60 VPR+
Operation
•
Once the device has been switched on, the drying function
works fully automatically.
•
The ionization function may be started manually as
needed, see chapter Ionization.
•
To make sure that the built-in sensor can determine the
humidity correctly and that the room air is permanently
filtered, the fan continues to operate until the device is
switched off.
•
Avoid open doors and windows.
Info
The possible dehumidification performance of the DH-
VPR+ climate managers is directly tied to the room
temperature.
The higher the room temperature, the more moisture
can be withdrawn from the room air.
The lower the room temperature, the less moisture can
be withdrawn from the room air.
For more information please read the chapter
Important information regarding the
dehumidification performance and drying rate
. The
physical correlations are illustrated elaborately by way
of example scenarios and the recommended course of
action.
Operating elements
Info
You can access the operating elements by opening the
filter flap at the device, see chapter Maintenance.
The control panel of the DH 30 VPR+ is located on the
left-hand side, in case of the DH 60 VPR+ it can be
found on the right.
The depiction of the operating elements features the
device DH 60 VPR+ by way of example. In case of the
DH 30 VPR+, the individual operating elements can be
located elsewhere but with identical labelling.
NORM
AL
DRIER
8
9
10
11
12
13
No.
Designation
8
Control dial hygrostat
9
Fusing 6.3 A / T (time delay)
10
Power Ionization
button
11
Ionizer control dial
12
Warning light
13
Fan stage switch
Installing the condensation drain hose
1. Connect one end of the condensation drain hose to the
bulkhead coupling.
DH 30 VPR+
DH 60 VPR+
2. Place the other end of the condensation drain hose in a
sufficiently dimensioned container (at least 50 litres for the
DH 30 VPR+, 90 for the DH 60 VPR+) or lead the hose end
to a drain.
3. Avoid kinking.