background image

In the event of a product fault or complaint occurring, 
the following procedure should be followed:
DO NOT REMOVE THE PRODUCT

1.  Telephone Customer Experience on 

024 7637 2222

 having 

available your details including post code, the model number 
and power rating of the product, together with the date of 
purchase and, where applicable, details of the particular fault.

2.  If required, the Customer Experience Advisor will arrange for a 

qualifi ed engineer to call.

3.  All products attended to by a Triton service engineer must be 

installed in full accordance with the Triton installation guide 
applicable to the product. Every product pack contains an 
installation guide, however, they can also be downloaded free at 
www.tritonshowers.co.uk. 

4.  Our engineer will require local parking and if a permit is required, 

this must be available to the engineer on arrival at the call.

5.  If loft access is required for isolation or to complete a repair, 

the loft must have a fi xed access ladder and be boarded, with 
appropriate lighting from the access point to and around the 
repair area.

6.  It is essential that you or an appointed representative, who must 

be over 18 years of age, is present for the duration of the service 
engineer’s visit. If the product is in guarantee you must produce 
proof of purchase.

7.  Where a call under the terms of guarantee has been booked 

and the failure is not product related (i.e. scaling and furring, 
incorrect water pressure, pressure relief device operation or 
electrical/plumbing installation fault) a charge will be made. A 
charge will also be issued if nobody is at the property when the 
service engineer calls or adequate parking/permit is not available.

8.  If the product is no longer covered by the guarantee an up-front 

fi xed fee will be charged before the site visit.

9.  Your receipt must be retained as proof of purchase. Should proof 

of purchase not be available on an ‘in-guarantee’ call, or should 
the service engineer fi nd that the product is no longer under 
guarantee, the engineer will charge the same fi xed price and 
will request payment prior to departing. If payment is not made 
on the day an administration charge will be added to the fi xed 
charge.

10.  If a debt is outstanding from a previous visit, or from any other 

Triton purchase, Triton reserves the right to withhold service until 
the debt has been settled.

11.  Triton takes the health, safety and wellbeing of its employees 

very seriously and expects customers to treat all staff members 
with respect. Should any employee feel threatened or receive 
abuse, either verbally or physically, Triton reserves the right to 
withhold service.

Replacement Parts Policy

In line with AMDEA guidelines, Triton retains functional spares 
for as long as there is a market for them and in most cases, well 
beyond.  Due to the vast array of product types, the life cycle of 
products can vary and therefore so can the length of time parts 
can be supplied. Spare parts can be ordered via our online spare
parts store or by telephoning Triton Customer Experience team
on 

024 7637 2222

. Payment should be made by

credit / debit card (excluding American Express or Diners Card).
Payment can also be made by pre-payment of a pro-forma
invoice, by cheque or postal order.

Telephone orders are based on information given during 
the call.  Before contacting Triton, please verify your 
requirements using the Triton website or your professional 
installer. Triton cannot accept liability for incorrect part 
identifi cation. 

TRITON UK STANDARD GUARANTEE

This guarantee applies only to products installed within the 
United Kingdom and does not apply to products used
commercially.  This guarantee does not affect your statutory 
rights.
With the exception of accessories, Triton guarantee the 
product against all manufacturing defects for a period of 

2 years

 (for domestic use only) from the date of purchase, 

provided that it has been installed by a competent person in 
full accordance with the fi tting instructions. 
All accessories such as shower heads, hoses and riser rails carry 

1 year

 parts only guarantee against manufacturing defects.

Any part found to be defective during this guarantee period 
we undertake to repair or replace at our option without 
charge, so long as it has been properly maintained and
operated in accordance with the operating instructions and 
has not been subject to misuse or damage. This product must 
not be taken apart, modifi ed or repaired except by a person 
authorised by Triton. 

What is not covered:

1.  Breakdown due to:  

a) 

use other than domestic use by the property 

occupants; 

b)

 wilful act or neglect; 

c) 

any malfunction resulting from the incorrect use or 

quality of electricity, gas or water or incorrect setting of 

controls; 

d) 

failure to install in accordance with this installation 

guide.

2.  Claims for missing parts once the product has been 

installed.

3.  Repair costs for damage caused by foreign objects or 

substances.

4.  Total loss of the product due to non-availability of parts.
5.  Compensation for loss of use of the product or 

consequential loss of any kind.

6.  Call out charges due to an abortive visit or where no fault 

has been found with the appliance.

7.  The cost of repair or replacement of isolating switches, 

electrical cable, fuses and/or circuit breakers or any other 

accessories installed at the same time. Replacement of the 

Pressure Relief Device that only activates when the shower 

outlet is blocked is also excluded. 

8.  The cost of routine maintenance, adjustments, overhaul 

modifi cations or loss or damage arising therefrom, 

including the cost of repairing damage, breakdown, 

malfunction caused by corrosion, furring, frost or exposure 

to freezing conditions.

9.  Callout charges where the water supply cannot be 

isolated, this includes consequential losses arising from 

unserviceable supply valves, or inaccessible product or 

valves located in a loft space without suitable access.

For the latest Terms & Conditions please see:

www.tritonshowers.co.uk/terms

PLEASE NOTE PRODUCT REGISTRATION IS ONLY

AVAILABLE TO UNITS PURCHASED & INSTALLED IN THE UK

Triton Showers
Triton Road
Nuneaton
Warwickshire, CV11 4NR

Triton is a division of Norcros Group (Holdings) Limited

Customer Experience: 024 7637 2222

Trade Installer Hotline: 024 7637 8344

www.tritonshowers.co.uk

E-mail: [email protected]

E-mail: [email protected]

UK SERVICE POLICY

Triton reserve the right to change product specifi cation without prior notice. E&OE. © TRITON SHOWERS 2020

Содержание T70 GSI

Страница 1: ...when not in use This is a safety procedure recommended for all electrical appliances The showerhead and hose supplied with this product are a safety critical part of your shower Failure to use genuin...

Страница 2: ...ing other than those specified This appliance is intended to be permanently connected to the water mains and not connected by a hose set A suitable double pole isolation switch for supply disconnectio...

Страница 3: ...ulations or any particular regulations as specified by Local Water Company or Water Undertakers and should be in accordance with BS EN 806 2 2 The supply pipe must be flushed to clear debris before co...

Страница 4: ...re setting At different times of the year you may have to adjust the position of the temperature control to maintain your desired temperature setting c The stabiliser valve minimises variations in sho...

Страница 5: ...r to the wall 13 15 Plumbing connections 16 Electrical connections 17 Fitting The Cover valve knob positions 18 19 Commissioning procedure 20 Cleaning the filter installers service engineers only 21 F...

Страница 6: ...08mm 108mm 308mm ENTRY POINTS DIMENSIONS WATER Left Bottom Back Top Side Right Bottom Back Side CABLE Left Bottom Back Top Side Right Bottom Back Side Back Back Others Others Inlet connection 15mm dia...

Страница 7: ...the whole installation at the mains supply and remove the correct fuse 3 The shower must be connected to its own independent electrical circuit IT MUST NOT be connected to a ring main spur socket out...

Страница 8: ...ng in a bath or shower cubicle It should be readily accessible to switch off after using the shower 7 Where shower cubicles are located in any rooms other than bathrooms all socket outlets in those ro...

Страница 9: ...es per minute the inlet of the shower for full performance for 8 5Kw 9 5Kw Minimum running pressure and flow to 150kPa 1 5 bar at 11 litres per minute the inlet of the shower for full performance for...

Страница 10: ...he incoming water Economy setting single red circle Economy uses only one of the elements within the heater can NOTE If the stated flow rate required for the unit cannot be met due to low water pressu...

Страница 11: ...ure exceeds the showering safety limit the power to the elements will be removed completely although water will continue to flow When the temperature has cooled sufficiently power to the elements will...

Страница 12: ...espoke hose retainer it will in most cases meet this requirement If the showerhead can still be placed within a bath basin or shower tray within the 25mm limit then a double check valve or similar MUS...

Страница 13: ...the fitting 180 fig 9B Secure with the screw included in the screw pack fig 9C NOTE The Inlet is not fixed during production Deviations from the designated entry points will invalidate product approv...

Страница 14: ...ut positions Decide if top or bottom pipe entry is required Once chosen carefully remove the appropriate cut out using a junior hacksaw and file PLEASE NOTE NONE of the cut outs are designed as snap o...

Страница 15: ...nto position leaving the base of the screw head protruding 6mm out from the wall Hook the backplate over the top screw and fit the bottom fixing screw into position Do not fully tighten the screws at...

Страница 16: ...ss point to the isolator IMPORTANT Before completing the connection of the water supply to the inlet of the shower flush out the pipework to remove all swarf and system debris This can be achieved by...

Страница 17: ...IMPORTANT Fully tighten the terminal block screws and make sure that no cable insulation is trapped under the screws Loose connections can result in cable overheating NOTE The supply cable earth cond...

Страница 18: ...bottom fig 15 2 With the cover off the shower turn the stabiliser valve spindle fully clockwise until resistance is felt fig 16 4 With the cover off the shower turn the temperature control to the 5 O...

Страница 19: ...the OFF position and the temperature control is turned fully clockwise the 5 o clock position Offer the cover to the unit Carefully guide the cover onto the backplate making sure the wires are not tr...

Страница 20: ...s to flow from the flexible hose Slowly turn the temperature control fully anti clockwise fig 20 It will take about thirty seconds for a smooth flow of water to be obtained while air and any debris is...

Страница 21: ...on SWITCH OFF the electricity and water supply at the mains The inlet filter is situated inside the water inlet fitting fig 21 To gain access to the filter remove the cover and bottom trimplate Unscre...

Страница 22: ...ase in ambient water temperature 2 3 1 Readjust flow rate to give increased flow 2 3 2 Select economy power 3 Water temperature cycling hot cool at intervals 3 1 Heater cycling on thermal cut out 3 1...

Страница 23: ...ed while commissioning 6 3 1 Fit new PRD Commission unit with showerhead removed 6 4 Water pressure above specified maximum for unit see rating label 6 3 1 Fit pressure reducing valve to inlet and the...

Страница 24: ...electric products are labelled accordingly with the crossed out wheeled bin symbol This indicates for disposal purposes at end of life that these products must be taken to recognised collection point...

Страница 25: ...TS USED 0 1 2 H O T HOT COLD Turn the main power isolator switch ON Power Knob setting Temperature Knob setting To START the shower turn the power knob from the OFF position to Cold Economy or High 1...

Страница 26: ...26...

Страница 27: ...27...

Страница 28: ...ners Card Payment can also be made by pre payment of a pro forma invoice by cheque or postal order Telephone orders are based on information given during the call Before contacting Triton please verif...

Отзывы: