COMMISSIONING

COMMISSIONING

•  The first operation of the shower is intended 

to flush out any remaining unit debris and 

to make sure the heater unit contains water 

before the elements are switched on.

•  This operation must be carried out with 

the flexible hose screwed to the outlet but 

WITHOUT

 the showerhead attached, and 

the outlet from the flexible hose should be 

directed to waste.

  

IMPORTANT: BEFORE switching on the 

electric and mains water supplies to 

the shower

 - check that the power selector 

is in the 

OFF

 position and the temperature 

control is turned 

fully clockwise

NOTE:

 Failure to follow the instructions above, may 

cause the PRD to operate if the Start/Stop button is in 

the ‘START’ position when the isolator is switched on.

  Turn the power selector to the 

COLD

 setting 

(fig.19)

 and wait until water starts to flow 

from the flexible hose.

   Slowly turn the temperature control 

fully 

anti-clockwise

 

(fig.20)

. It will take about 

thirty seconds for a smooth flow of water to 

be obtained while air and any debris is being 

flushed from the shower. When there is a 

smooth flow of water, turn the temperature 

control steadily from 

Fully Anti-Clockwise 

to

 

Fully Clockwise

 and back again several times 

to release any trapped air within the unit. 

   Once flushing out has been completed, turn 

the power selector to the 

OFF

 position.

   Fit the showerhead to the flexible hose and 

place in the showerhead holder.

   The shower is now ready for normal operation.

IMPORTANT

IMPORTANT

Before normal operation of 

Before normal operation of 

the shower, it is essential 

the shower, it is essential 

the following commissioning 

the following commissioning 

procedure is completed correctly.

procedure is completed correctly.

Power selector 

to 

COLD

Temperature 

control. 

Turn fully 

clockwise

Temperature 

control. 

Turn fully 

anti-clockwise

Fig.20

Fig.19

OFF

COLD

Содержание T70 GSI

Страница 1: ...when not in use This is a safety procedure recommended for all electrical appliances The showerhead and hose supplied with this product are a safety critical part of your shower Failure to use genuin...

Страница 2: ...ing other than those specified This appliance is intended to be permanently connected to the water mains and not connected by a hose set A suitable double pole isolation switch for supply disconnectio...

Страница 3: ...ulations or any particular regulations as specified by Local Water Company or Water Undertakers and should be in accordance with BS EN 806 2 2 The supply pipe must be flushed to clear debris before co...

Страница 4: ...re setting At different times of the year you may have to adjust the position of the temperature control to maintain your desired temperature setting c The stabiliser valve minimises variations in sho...

Страница 5: ...r to the wall 13 15 Plumbing connections 16 Electrical connections 17 Fitting The Cover valve knob positions 18 19 Commissioning procedure 20 Cleaning the filter installers service engineers only 21 F...

Страница 6: ...08mm 108mm 308mm ENTRY POINTS DIMENSIONS WATER Left Bottom Back Top Side Right Bottom Back Side CABLE Left Bottom Back Top Side Right Bottom Back Side Back Back Others Others Inlet connection 15mm dia...

Страница 7: ...the whole installation at the mains supply and remove the correct fuse 3 The shower must be connected to its own independent electrical circuit IT MUST NOT be connected to a ring main spur socket out...

Страница 8: ...ng in a bath or shower cubicle It should be readily accessible to switch off after using the shower 7 Where shower cubicles are located in any rooms other than bathrooms all socket outlets in those ro...

Страница 9: ...es per minute the inlet of the shower for full performance for 8 5Kw 9 5Kw Minimum running pressure and flow to 150kPa 1 5 bar at 11 litres per minute the inlet of the shower for full performance for...

Страница 10: ...he incoming water Economy setting single red circle Economy uses only one of the elements within the heater can NOTE If the stated flow rate required for the unit cannot be met due to low water pressu...

Страница 11: ...ure exceeds the showering safety limit the power to the elements will be removed completely although water will continue to flow When the temperature has cooled sufficiently power to the elements will...

Страница 12: ...espoke hose retainer it will in most cases meet this requirement If the showerhead can still be placed within a bath basin or shower tray within the 25mm limit then a double check valve or similar MUS...

Страница 13: ...the fitting 180 fig 9B Secure with the screw included in the screw pack fig 9C NOTE The Inlet is not fixed during production Deviations from the designated entry points will invalidate product approv...

Страница 14: ...ut positions Decide if top or bottom pipe entry is required Once chosen carefully remove the appropriate cut out using a junior hacksaw and file PLEASE NOTE NONE of the cut outs are designed as snap o...

Страница 15: ...nto position leaving the base of the screw head protruding 6mm out from the wall Hook the backplate over the top screw and fit the bottom fixing screw into position Do not fully tighten the screws at...

Страница 16: ...ss point to the isolator IMPORTANT Before completing the connection of the water supply to the inlet of the shower flush out the pipework to remove all swarf and system debris This can be achieved by...

Страница 17: ...IMPORTANT Fully tighten the terminal block screws and make sure that no cable insulation is trapped under the screws Loose connections can result in cable overheating NOTE The supply cable earth cond...

Страница 18: ...bottom fig 15 2 With the cover off the shower turn the stabiliser valve spindle fully clockwise until resistance is felt fig 16 4 With the cover off the shower turn the temperature control to the 5 O...

Страница 19: ...the OFF position and the temperature control is turned fully clockwise the 5 o clock position Offer the cover to the unit Carefully guide the cover onto the backplate making sure the wires are not tr...

Страница 20: ...s to flow from the flexible hose Slowly turn the temperature control fully anti clockwise fig 20 It will take about thirty seconds for a smooth flow of water to be obtained while air and any debris is...

Страница 21: ...on SWITCH OFF the electricity and water supply at the mains The inlet filter is situated inside the water inlet fitting fig 21 To gain access to the filter remove the cover and bottom trimplate Unscre...

Страница 22: ...ase in ambient water temperature 2 3 1 Readjust flow rate to give increased flow 2 3 2 Select economy power 3 Water temperature cycling hot cool at intervals 3 1 Heater cycling on thermal cut out 3 1...

Страница 23: ...ed while commissioning 6 3 1 Fit new PRD Commission unit with showerhead removed 6 4 Water pressure above specified maximum for unit see rating label 6 3 1 Fit pressure reducing valve to inlet and the...

Страница 24: ...electric products are labelled accordingly with the crossed out wheeled bin symbol This indicates for disposal purposes at end of life that these products must be taken to recognised collection point...

Страница 25: ...TS USED 0 1 2 H O T HOT COLD Turn the main power isolator switch ON Power Knob setting Temperature Knob setting To START the shower turn the power knob from the OFF position to Cold Economy or High 1...

Страница 26: ...26...

Страница 27: ...27...

Страница 28: ...ners Card Payment can also be made by pre payment of a pro forma invoice by cheque or postal order Telephone orders are based on information given during the call Before contacting Triton please verif...

Отзывы: