background image

T300si electric shower

at the isolating switch and stopvalve. Contact 
Customer Service for advice on replacing the 
PRD.
DO NOT operate the shower with a damaged or 
kinked shower hose, or a blocked showerhead 
which can cause the PRD to operate.
When commissioning, the showerhead must be 
removed from the flexible hose. If not removed,  
again it may cause the PRD to operate.

Routing control cable and heated water

pipe

After deciding the position of the riser rail and 
control panel, you may wish first to channel a 
route for the semi rigid heated water pipe and 
the control cable from the remote pack position 
to the control panel and bulkhead position.
The control cable must exit the shower cubicle 
wall through a 15 mm hole — marked ‘B’ on 
the supplied fixing template 

(fig.)

. Place the 

template on the wall and mark the position of 
the 15 mm hole. 
Drill and channel a route as required. Place 
and position the control cable between the 
remote pack and control panel. Make sure there 
is enough slack cable at the remote pack end 
in order for the control panel to be removed 
should the need arise for future maintenance
Within the shower cubicle, the end of the 
control cable outer sleeve must be flush with the 
finished wall surface to allow easy installation, 
and the inner cable should be loose and able 
to slide through the outer sleeve when finally 
installing the control panel.
It is advisable to seal the outer sleeve in the hole 
using a silicon seal.
Make good the wall, including any tiling, as all 
the units must be screwed to the finished wall 
surface. 

ImporTAnT:

 

In the shower area the control 

cable linking the remote pack and control 
panel must be secured by routing through 
conduit, trunking or capping if embedding in 
the wall. It must Not be surface clipped.

A

A

A

B

A

Fig.

400 mm

approx

250 mm

approx

Fig.9

Содержание T300si

Страница 1: ...Installation and operating instructions T300si electric shower 2180280J May 2008 Installers please note these instructions are to be left with the user...

Страница 2: ...t 17 Fitting the control panel 18 Fitting the remote pack cover 18 Commissioning 19 Operating the shower 21 Operating functions 23 Cleaning 24 Instructions for installers and service engineers only 25...

Страница 3: ...nd could also cause the Pressure Relief Device in the unit to operate This product is not suitable for mounting into steam rooms or steam cubicles PLUMBING The plumbing installation must comply with W...

Страница 4: ...cannot obtain cooler water first check the showerhead has not become blocked This book contains all the necessary fitting and operating instructions for your Triton T300si electric shower please read...

Страница 5: ...9 Solenoid valve 10 Guide pockets 11 Can and element assembly 12 Thermal safety cut out main 13 Earth connection 14 Control cable clamp 15 Thermal cut out outlet 16 Outlet pipe 17 Transformer 18 Conn...

Страница 6: ...ircuits This may be part of the consumer unit or a separate unit 6 A 45 amp double pole isolating switch with a minimum contact gap of 3 mm in both E 002 A 230 240V ac supply If you are installing a s...

Страница 7: ...and cable size there is a maximum permissible circuit length 9 The shower circuit should be separated from other circuits by at least twice the diameter of the cable or conduit 9 1 The current rating...

Страница 8: ...m ow rate of eleven litres per minute For all units the maximum static pressure must be no greater than 1000kPa 10 bar If in any doubt the pressure should be checked Note If the stated ow rate is not...

Страница 9: ...ouble check valve or a similar device must be fitted in the supply pipework to prevent back flow Pressure relief safety device A pressure relief device PRD is designed into the shower unit which compl...

Страница 10: ...mark the position of the 15 mm hole Drill and channel a route as required Place and position the control cable between the remote pack and control panel Make sure there is enough slack cable at the re...

Страница 11: ...mote pack is installed in a loft area the following requirements must be met for future servicing purposes a There must be no risk of the remote pack heated water pipe or PRD tube becoming frozen b Th...

Страница 12: ...wall Entry positions for the mains water are from the bottom or from the rear Cable entry is via the top or rear Note Deviations from the designated entry points will invalidate product approvals If...

Страница 13: ...of the remote pack flush out the pipework to remove all swarf and system debris This do this connect a hose to the pipework and turn on the mains water supply long enough to clear the debris to waste...

Страница 14: ...from the remote pack Any surplus can be cut off as required Note The water outlet does not need to be vertically above or below the control panel If required the outlet adaptor and control panel can...

Страница 15: ...as they are similar in diameter and length the PRD tube is clear Important Do not bend either the PRD tube or heated water pipe sharply as they will kink and restrict the water flow If a tight bend i...

Страница 16: ...bulkhead and its cover are supplied assembled Separate the two halves by carefully prising apart at the smaller of the two elbow apertures Secure the elbow to the bulkhead body with the three screws s...

Страница 17: ...to the back of the bulkhead Apply PTFE tape to the threaded connector Screw the bulkhead assembly onto the threaded connector until tight to the wall and the two fixing holes are aligned Secure to th...

Страница 18: ...l block screws and check that no cable insulation is trapped under the screws Loose connections can result in cable overheating Note The supply cable earth conductor must be sleeved The outer sheath o...

Страница 19: ...access panel fig 28 to reveal the connector socket Cable entry into the remote pack is through one of the built in cut outs Remove the protective dust covers from both ends of the control cable Once t...

Страница 20: ...e purge pin is located on its two pins the factory set position see fig 34 Locate the tags on the cover into the holes on the backplate and guide into position Secure the cover in position with the th...

Страница 21: ...old and low pressure This flashing sequence lasts about twenty seconds All lights will then go out except the Start Stop surround indicating that power is on to the unit Press the Start Stop button fi...

Страница 22: ...off its two pins and in order to store it for use at a later date replace it on one of the pins Replacing the remote pack cover Locate the tags on the cover into the holes on the backplate and guide i...

Страница 23: ...switch All lights will go out except the Start Stop surround indicating that power is on to the unit The shower is now ready for normal operation To start the shower Press the Start Stop button and im...

Страница 24: ...a different temperature to the same number position on high To decrease the shower temperature Turn the temperature control anti clockwise fig 36 This will increase the flow of water through the showe...

Страница 25: ...in operation Phased shutdown In use when the Start Stop button is pressed power is switched off to the elements Water continues to flow for a few seconds flushing out any remaining hot water This make...

Страница 26: ...once the unit has been repaired W 007 A WARNING DO NOT use abrasive or aggressive cleaning products when cleaning the shower as they may damage the unit Cleaning CLEANING Before cleaning turn off the...

Страница 27: ...id inlet fig 42 To gain access to the filter remove the cover then disconnect and remove the compression fitting Also depending on the incoming pipework arrangements if there is not enough slack in th...

Страница 28: ...Solenoid valve 83304130 10 Outlet pipe assembly 85000090 11 Trimplate 7051754 12 PRD O ring 83301330 13 Remote pack cover 85200030 14 PCB control panel 7072569 15 Control panel assembly white 8740002...

Страница 29: ...er supply mains or tank fed If tank fed replumb to mains water supply or see 4 2 4 If mains fed make sure that the mains stopvalve is fully open and there are no other restrictions in the supply while...

Страница 30: ...nit with showerhead removed Fit pressure reducing valve to inlet and then fit new PRD 4 2 3 4 2 4 4 3 1 4 3 2 4 4 1 5 1 1 6 1 1 6 2 1 6 2 2 7 1 1 7 2 1 7 3 1 7 4 1 required see rating label Reduction...

Страница 31: ...T300si electric shower 29...

Страница 32: ...onshowers co uk Triton Showers Triton Road Nuneaton Warwickshire CV11 4NR Triton is a division of Norcros Group Holdings Limited TRiTon STandaRd GuaRanTee Triton guarantee this product against all mec...

Отзывы: