5
t150z pumped thermostatic electric shower
The first operation of the shower is intended to
flush out any remaining unit debris and to make
sure the heater unit contains water before the
elements are switched on.
• Make sure that the electricity supply to the
unit and isolating switch has been turned off,
then remove the front cover and disconnect
the PCB cable. Also remove the right hand
trimplate.
• Turn the water supply to the unit on and turn
the bleed screw
(fig.5)
approximately 3
turns out. Make sure that an absorbent cloth
is in place to catch any purged water. Let the
water flow, approximately 30-60 seconds is
advised, until a steady stream of water with
no bubbles in it flows from the bleed screw.
Once this has been achieved re tighten the
bleed screw.
• Refit the right hand trimplate and the cover
(fig.6, 7)
-
DO NOT connect the PCB
cable at this time
(This will allow the unit
to operate in “commissioning mode”. This
allows the pump to operate, but does not
engage the heater can circuits. This is to
allow the system to flush and fill with water
and purge any remaining air).
• Secure the cover with a couple of the
retaining screws.
COMMISSIONING
Open
Turn bleed
screw 3
turns out
Fig.5
Fig.6
IMPORTANT
:
When the T150Z being comissioned is to
be used in the capacity of a BEAB Care
shower, please refer to pages 28 - 29 and
make sure that the appropriate sections
are completed.
Содержание t150z
Страница 34: ...32 T150Z pumped thermostatic electric shower ...
Страница 35: ...33 T150Z pumped thermostatic electric shower ...
Страница 37: ...Pdf Supplied By http www plumbworld co uk ...