27
Triple Solar assembly instruction PVT heat pump panels UK January 2021
Figure 9.1-e Cover plate in position
Mounting rail covers
•
Slightly bend the mounting rail cover by squeezing the sides together.
•
Slide the cover over the mounting rail.
Figure 9.2-a Covering the ends of the mounting rails
10. Activating the system
Testing leak tightness, filling and system pressure
Leak tightness test
•
Always first pressurize the installation with air to detect leaks.
•
Check all gaskets and hydraulic connections for fluid tightness.