versie 22-01-2021
S t
a n
Inhoudsopgave
Panels ......................................................................................................... 3
Mounting rails per panel ................................................................................ 3
PVT basis package 1-s, first panel in a row SPIGOT........................................... 3
PVT basis package 2, next panel in a row......................................................... 4
Pitched roof, bracket set ................................................................................ 4
Pitched roof, feet for EPDM/bitumen roof ......................................................... 5
Pitched roof assembly package with cover plate................................................ 5
Pitched roof gland with flexible hoses .............................................................. 5
Flat roof mounting with Sunbeam frame .......................................................... 5
6. Preparing a EPDM/bitumen roof ................................................................... 12
7. Placing the panels on the mounting rails ...................................................... 13
The TS clamping profile ................................................................................13
Mounting of the panels .................................................................................14
Mounting the TS clamping profile ...................................................................16
Mounting connecting hoses ...........................................................................17
Connecting the PV panels electrically..............................................................17
Material and position ....................................................................................18
Pipe diameters of source pipes ......................................................................21
Hydraulic plan .............................................................................................21
Filling medium.............................................................................................23
Installing the expansion vessel ......................................................................23
Connecting thermostatic mixing valve ............................................................23
Insulation ...................................................................................................23
Micro air bubble separator ............................................................................24
pipe clamps and cover plate......................................................25
Testing leak tightness, filling and system pressure .........................................27
Commissioning the heat pump (IBS) ............................................................28
11. Warranty conditions and maintenance ....................................................... 29