background image

TrinityHighway.com

  

Created November 2021

 

 

Table of Contents 
 

Customer Service Contacts 

 ................................................................................................................................. 

4

 

Limitations and Warnings  ........................................................................................................................ 5 
Overview  

 .................................................................................................................................... 6 

Inspect Shipment SRT™ 31 System  ....................................................................................................... 8 
SRT™ 31 System Components/Hardware ............................................................................................... 9 
Recommended Tools ............................................................................................................................. 12 
Site Preparation   .................................................................................................................................. 13 
Post Placement    .................................................................................................................................. 14 
Rigid Pavement and Rock  ..................................................................................................................... 14 
Assembly Steps    .................................................................................................................................. 14 
 

STEP 1A:  SRT™ 31 System (34’-4 1/2” Long) Post Layout  .......................................................... 15 

 

STEP 1B:  SRT™ 31 System (40’-7 1/2” Long) Post Layout  .......................................................... 16 

 

STEP 2A:  SRT™ 31 System (34’-4 1/2” Long) Post 2-6 Assembly ................................................ 17 

 

STEP 2B:  SRT™ 31 System (40’-7 1/2” Long) Post 2-7 Assembly ................................................ 18 

 

STEP 3:    CR Post 1 Bottom Assembly … ...................................................................................... 19 

 

STEP 4:    CR Post 1 Top Assembly  ............................................................................................... 20 

 

STEP 5:    SYTP

®

 2 Assembly  ......................................................................................................... 21 

 

STEP 6:    SYTP

®

 4 Assembly  ......................................................................................................... 22 

 

STEP 7A:  SRT™ System (34’-4 1/2” Long) SRT™-3 Guardrail Assembly ..................................... 23 

 

STEP 7B:  SRT™ System (40’-7 1/2” Long) SRT™-3 Guardrail Assembly ..................................... 24 

 

STEP 8     SRT™ Systems SRT™-2 Guardrail Assembly ............................................................... 25 

 

STEP 9:    SRT™ Systems SRT™-1 Anchor Guardrail Assembly ................................................... 26 

 

STEP 10:  SRT™ Slot Guard Assembly ........................................................................................... 27 

 

STEP 11:  SRT™ Anchor Bracket Assembly ................................................................................... 28 

 

STEP 12:  SRT™ Anchor Cable Assembly  ..................................................................................... 29 

 

STEP 13:  SRT™ Angle Strut Assembly .......................................................................................... 30 

 

STEP 14:  SRT™ Buffer Assembly .................................................................................................. 31 

 

STEP 15:  SRT™ Delineation Assembly .......................................................................................... 32 

SRT™ 31 System Assembly Checklist (File With Project Records) ...................................................... 33 
SRT™ 31 System Repair Checklist (File With Maintenance Records) .................................................. 34 
SRT™ 31 Routine Inspection Checklist (File with Maintenance Records) ............................................  35 
APPENDIX A:  AASHTO Roadside Design Guide Grading Detail ......................................................... 36 
APPENDIX B:  Leave-Outs .................................................................................................................... 37 
APPENDIX C:  Encountering Rock ........................................................................................................ 38 
NOTES ................................................................................................................................................... 39 
 

SRT™ 31 SYSTEM ACRONYMS 

AASHTO 

 

American Association of State Highway and Transportation Officials  

FHWA 

Federal Highway Administration 

CFR 

Code of Federal Regulation 

CR 

Cable Release 

MUTCD 

 

Manual on Uniform Traffic Control Devices 

NCHRP 

 

National Cooperative Highway Research Program  

NHS 

 

National Highway System 

OSHA 

 

Occupational Safety & Health Administration 

PPE 

 

Personal Protective Equipment 

SYTP

®

 

 

Steel Yielding Terminal Post® 

SRT™ 31 System 

 

Slotted Rail Terminal-31 System 

TL-X 

 

Test Level X; X refers to the different Test Levels; 1, 2 or 3 

Trinity Highway 

 

Trinity Highway Products, LLC

Содержание SRT 31 System

Страница 1: ...Created November 2021 PN 626825 SRT TM TM 31 System Flared End Terminal Product Description Assembly Manual...

Страница 2: ...or death Important These instructions are for standard assembly specified by the state specifying agency In the event the specified system assembly maintenance or repair would require a deviation fro...

Страница 3: ...TrinityHighway com 2 Created November 2021 SRT 31 System Flared End Terminal The SRT 31 System is a straight flared single sided re directive and gating end terminal...

Страница 4: ...embly 27 STEP 11 SRT Anchor Bracket Assembly 28 STEP 12 SRT Anchor Cable Assembly 29 STEP 13 SRT Angle Strut Assembly 30 STEP 14 SRT Buffer Assembly 31 STEP 15 SRT Delineation Assembly 32 SRT 31 Syste...

Страница 5: ...its assembly procedures supporting documentation and performance is always welcome Additional information can be obtained from the contact information below Trinity Highway Telephone 888 356 2363 USA...

Страница 6: ...specified condition or replaced as the state specifying agency determines requires as soon as possible Product selection approval proper installation and maintenance of any highway product is the sol...

Страница 7: ...st at post location 1 Steel Yielding Terminal Post SYTP at post locations 2 6 SRT Angle Strut SRT Cable Anchor Bracket and SRT Anchor Cable SRT Shelf Angle at post 2 SRT Flange Protector at posts 2 4...

Страница 8: ...TrinityHighway com 7 Created November 2021 SRT 31 System 40 7 1 2 Long 31 High Reference drawing SS616...

Страница 9: ...5000G 5 5 G SRT Flange Protector at Posts 2 4 6 7G 3 3 I SRT Cable Anchor Bracket 700A 1 1 K SRT Angle Strut 3 x 3 x 1 4 75 mm x 75 mm x 6 mm 33875G 1 1 L SRT Shelf Angle At Post 2 34054G 1 1 M SRT Bu...

Страница 10: ...ponents hardware and quantities required for SRT 31 System selected to be assembled Note The following components hardware are not shown to scale ID A PN 30G ID B PN 39G ID C PN 10967G SRT 1 Anchor Gu...

Страница 11: ...Assembly 3 4 x 6 6 ID O PN 4211G ID P PN 9960G ID Q PN 33909G 5 16 x 1 75 Hex Bolt SRT Slot Guard SRT Cable Anchor Bracket Angle ID R PN 3400G ID S PN 4419G ID T PN 3910G 5 8 x 2 HGR Post Bolt 5 8 x...

Страница 12: ...Hex Bolt A325 5 16 Round Washer SRT 3 Guardrail 15 7 1 2 ID AA PN 3300G ID BB PN 3340G ID CC PN 3245G 5 8 Round Washer 5 8 GR Hex Nut 5 16 Hex Nut ID DD PN 6665B ID EE PN 6666B Delineation Striped Yel...

Страница 13: ...Hammer Chalk Line Tape Measure Marking Paint and Pen Straight Edge Level Plumb Line Post Pounder commonly used for driving posts Auger Soil Tamper 5 8 Alignment Tool Drift Pin Locking Pliers Note The...

Страница 14: ...ply W beam guardrail must be placed between the SRT 31 System and the Thrie Beam transition or stronger stiffer post Important Do not attach the SRT 31 System directly to a rigid barrier i e concrete...

Страница 15: ...ined in the AASHTO Roadside Design Guide is provided around the posts and filled with state specifying agency approved backfill material See Appendix B for leave out requirements of the SYTP If rock i...

Страница 16: ...itical to the assembly of the SRT 31 Use only Trinity Highway parts that are specified herein for the SRT 31 System for assembling maintaining or repairing the SRT 31 System Do not utilize or otherwis...

Страница 17: ...itical to the assembly of the SRT 31 Use only Trinity Highway parts that are specified herein for the SRT 31 System for assembling maintaining or repairing the SRT 31 System Do not utilize or otherwis...

Страница 18: ...and post height are achieved for 6 SYTP 2 6 Part F per shown dimensions above 4 Ensure the center of the SYTP yielding holes are approximately at finished grade as shown Use only Trinity Highway parts...

Страница 19: ...nished grade as shown 5 Post 7 is a standard 6 1 83 m long W6x8 5 W150x13 kg or W6x9 W150x13 5 kg guardrail post Use only Trinity Highway parts that are specified herein for the SRT 31 System for asse...

Страница 20: ...Use only Trinity Highway parts that are specified herein for the SRT 31 System for assembling maintaining or repairing the SRT 31 System Do not utilize or otherwise commingle parts from other systems...

Страница 21: ...nut O 4211G 2 EA Y 3240G 2 EA CC 3245G 2 EA Use only Trinity Highway parts that are specified herein for the SRT 31 System for assembling maintaining or repairing the SRT 31 System Do not utilize or...

Страница 22: ...to a snug position with a minimum of two 2 bolt threads protruding beyond the nut L 34054G 2 EA R 3400G 2 EA BB 3340G 2 EA Use only Trinity Highway parts that are specified herein for the SRT 31 Syst...

Страница 23: ...en all threaded hardware to a snug position with a minimum of two 2 threads protruding beyond the nut R 3400G 1 EA BB 3340G 1 EA Use only Trinity Highway parts that are specified herein for the SRT 31...

Страница 24: ...with a minimum of two 2 bolt threads protruding beyond the nut S 4419G 1 EA U 3360G 8 EA BB 3340G 9 EA Use only Trinity Highway parts that are specified herein for the SRT 31 System for assembling ma...

Страница 25: ...il to SYTP 6 6 Tighten all threaded hardware to a snug position with a minimum of two 2 bolt threads protruding beyond the nut Z 20442G 1 EA U 3360G 8 EA BB 3340G 9 EA Use only Trinity Highway parts t...

Страница 26: ...y adjacent to the SRT 31 installation 5 Tighten all threaded hardware to a snug position with a minimum of two 2 bolt threads protruding beyond the nut U 3360G 8 EA BB 3340G 8 EA Use only Trinity High...

Страница 27: ...acent to the SRT 31 installation 6 Tighten all threaded hardware to a snug position with a minimum of two 2 bolt threads protruding beyond the nut R 3400G 1 EA U 3360G 8 EA BB 3340G 9 EA Use only Trin...

Страница 28: ...to the elongated slots 4 Insert all bolts from the traffic side per the diagram 5 Assemble the nuts on non traffic side of bolt 6 Tighten all threaded hardware to a snug position with a minimum of two...

Страница 29: ...readed hardware to a snug position with a minimum of two 2 bolt threads protruding beyond the nut W 3380G 8 EA AA 3300G 8 EA BB 3340G 8 EA Use only Trinity Highway parts that are specified herein for...

Страница 30: ...red taut when it does not deflect more than 1 inch 25 mm when pressure is applied by hand in an up or down direction Q 33909G 1 EA T 3910G 2 EA V 3900G 2 EA Use only Trinity Highway parts that are spe...

Страница 31: ...3 Use the SYTP hole in Post 2 that best aligns with the SRT Angle Strut 4 Tighten all threaded hardware to a snug position with a minimum of two 2 bolt threads protruding beyond the nut X 3391G 2 EA...

Страница 32: ...2 bolt threads protruding beyond the nut U 3360G 4 EA BB 3340G 4 EA Use only Trinity Highway parts that are specified herein for the SRT 31 System for assembling maintaining or repairing the SRT 31 S...

Страница 33: ...right or left hand assembly applications Trinity Highway makes no guarantees they meet the minimum specifications comply with MUTCD requirements or comply with state specifying agency requirements EE...

Страница 34: ...1 and 7 are not curved pp 23 26 13 Ensure the SRT 1 Anchor Guardrail and SRT 2 and 3 Guardrails are oriented correctly and lapped in the direction of the nearest adjacent traffic p 23 14 Ensure that...

Страница 35: ...sts 1 and 7 are not curved pp 23 26 13 Ensure the SRT 1 Anchor Guardrail and SRT 2 and 3 Guardrails are oriented correctly and lapped in the direction of the nearest adjacent traffic p 23 14 Ensure th...

Страница 36: ...from snowplow mowing or roadway operations Check for misalignment Check for missing system components Check for vandalism Check for damage caused by adverse weather conditions i e erosion weight of s...

Страница 37: ...rading must be accomplished before assembly of the SRT 31 System in accordance with state specifying agency guidelines OR the AASHTO Roadside Design Guide whichever is more stringent Failure to follow...

Страница 38: ...size of open space as defined in the AASHTO Roadside Design Guide is provided around the post s and filled with state specifying agency approved backfill material that will not prevent movement for an...

Страница 39: ...o install the SYTP Post 1 Drill a 21 24 525 mm 600 mm diameter hole a minimum 24 600 mm deep into the rock 2 A portion of the SYTP will have to be removed The amount to be cut off from the bottom of t...

Страница 40: ...TrinityHighway com 39 Created November 2021 NOTES...

Страница 41: ...TrinityHighway com 40 Created November 2021 NOTES...

Страница 42: ...complete information on Trinity Highway products and services visit us on the web at www trinityhighway com Materials and specifications are subject to change without notice Please contact Trinity Hig...

Отзывы: