STEP 2A
SRT™ 31 System (34’-4 1/2” Long)
Post 2-6 Assembly
PARTS
INSTRUCTIONS
F
15000G
5 EA
Reference Drawing SS436
1.
Assemble all parts in the configuration and orientation as shown above.
2.
The SRT™ 31 System must be attached to a 31” [787 mm] high strong post
W-beam guardrail system or to a strong post W-beam guardrail that has
been properly transitioned to 31” [787 mm] rail height per state/specifying
state/specifying agency.
3.
Ensure proper post spacing and post height are achieved for 6’
SYTP
®
2-6
(Part F) per shown dimensions above.
4. Ensure the center of the SYTP
®
yielding holes are approximately at finished
grade as shown.
Use only Trinity Highway parts
that are specified herein for the
SRT™ 31 System for assembling,
maintaining, or repairing the
SRT™ 31 System. Do not utilize
or otherwise commingle parts
from other systems even if those
systems are Trinity Highway
systems.
WARNINGS
Ensure proper site grading in accordance with state/specifying
agency guidelines or the AASHTO Roadside Design Guide,
whichever is more stringent. Failure to follow this warning could
result in serious injury or death in the event of a vehicle impact with
the system.