TrinityHighway.com
24
Revision D March 2021
Drill 7/8” [22 mm]
diameter by 5 3/4” [145 mm]
boreholes using the Monorail as a template.
Do not drill through foundation.
Figure 19
Final Anchor Height
(After Applied Torque)
ANCHOR
WASHER
ROADWAY
BACKUP OR MONORAIL
NUT
CAUTION:
1 1/2” [38 mm]
Maximum Anchor height
Top surfaces
must
be flush
Tongues must be
fully inserted and
flush
Detail A
Figure 18
Rail Height and Alignment
Detail A
Figure 17
Backup and Monorail Location for Tension Strut Backup
3/4X7 ANCHOR
TENSION STRUT BACKUP
4” [100 mm]
MONORAIL
CENTERLINE
CONSTRUCTION LINE
CONCRETE PAD
Содержание QuadGuard M Wide
Страница 1: ......
Страница 43: ...TrinityHighway com 42 Revision D March 2021 QuadGuard M Wide Tension Strut Backup QFMTSCVR U Drawings...
Страница 44: ...TrinityHighway com 43 Revision D March 2021 Concrete Pad 618686...
Страница 45: ...TrinityHighway com 44 Revision D March 2021 TS Concrete Pad 8 w Rebar 618686...
Страница 46: ...TrinityHighway com 45 Revision D March 2021 TS Concrete Pad 8 wo Rebar 618686...
Страница 47: ...TrinityHighway com 46 Revision D March 2021 Tension Strut Backup 627528...
Страница 48: ...TrinityHighway com 47 Revision D March 2021 Monorail Assembly 625637...
Страница 49: ...TrinityHighway com 48 Revision D March 2021 Diaphragm Assembly 627534...
Страница 50: ...TrinityHighway com 49 Revision D March 2021...
Страница 51: ...TrinityHighway com 50 Revision D March 2021...
Страница 52: ...TrinityHighway com 51 Revision D March 2021 Shim Kit 627518...
Страница 53: ...TrinityHighway com 52 Revision D March 2021 Fender Panel Assembly 608241...
Страница 54: ...TrinityHighway com 53 Revision D March 2021 Nose Assembly 627522...
Страница 55: ...TrinityHighway com 54 Revision D March 2021 End Shoe Transition 627729...
Страница 56: ...TrinityHighway com 55 Revision D March 2021 31 W Beam Guardrail Transition QFMTSCVR TWLR...
Страница 57: ...TrinityHighway com 56 Revision D March 2021 Thrie Beam Transition QFMTSCVR TTLR...
Страница 58: ...TrinityHighway com 57 Revision D March 2021 Safety Shape Barrier Transition QFMTSCVR T4LRF...
Страница 59: ...TrinityHighway com 58 Revision D March 2021 Single Slope Transition QFMTSCVR T6LRF...
Страница 60: ...TrinityHighway com 59 Revision D March 2021 QuadGuard M Wide TS w Block QFMTSCVR UVB...
Страница 61: ...TrinityHighway com 60 Revision D March 2021 Vertical Barrier Transition QFMTSCVR ESLR...
Страница 62: ...TrinityHighway com 61 Revision D March 2021 TS Concrete Pad w Block 627903...
Страница 63: ...TrinityHighway com 62 Revision D March 2021...
Страница 64: ......