TrinityHighway.com
23
Revision D March 2021
2)
Anchor the Tension Strut Backup (Figure 16)
Place Tension Strut Backup and Monorail on foundation with side of Backup and Monorail
on the construction line and rear edge of backup mounting pad 4” forward of foundation
edge (p. 24).
Verify that any applicable Transition Panels fit properly before anchoring
Backup.
Drill
7/8” [22 mm]
diameter by 5 3/4” [145 mm] anchor boreholes in foundation
using the Backup as template. Anchor the Backup to the concrete foundation using an
approved adhesive supplied with the QuadGuard
®
M Wide.
Note:
Verify that any applicable Transition Panels fit properly before anchoring Backup.
Caution:
Every hole in the Backup and Monorail must be anchored by a stud
using an approved adhesive.
3)
Anchor the Monorail
Monorail Placement for Tension Strut Backup (Figure 17)
Place Monorail on foundation with side of Monorail on construction line. Orient the Monorail
so the Monorail tongue faces the
Backup
and inserts into the backup monorail.
Warning:
Improper alignment at the Monorail splice joints may prevent proper
system collapse during an impact (p. 24, Detail A).
It is important to align each segment of Monorail from the back to the front of the system
within (±1/4” [6 mm]) along the length. Anchor each Monorail section using the Trinity
Highway approved adhesive kits provided.
Figure 16
Anchoring Tension Strut
Backup to Foundation
TENSION STRUT BACKUP
APPROVED ADHESIVE
WITH 3/4X7 ANCHOR ASSEMBLY
Содержание QuadGuard M Wide
Страница 1: ......
Страница 43: ...TrinityHighway com 42 Revision D March 2021 QuadGuard M Wide Tension Strut Backup QFMTSCVR U Drawings...
Страница 44: ...TrinityHighway com 43 Revision D March 2021 Concrete Pad 618686...
Страница 45: ...TrinityHighway com 44 Revision D March 2021 TS Concrete Pad 8 w Rebar 618686...
Страница 46: ...TrinityHighway com 45 Revision D March 2021 TS Concrete Pad 8 wo Rebar 618686...
Страница 47: ...TrinityHighway com 46 Revision D March 2021 Tension Strut Backup 627528...
Страница 48: ...TrinityHighway com 47 Revision D March 2021 Monorail Assembly 625637...
Страница 49: ...TrinityHighway com 48 Revision D March 2021 Diaphragm Assembly 627534...
Страница 50: ...TrinityHighway com 49 Revision D March 2021...
Страница 51: ...TrinityHighway com 50 Revision D March 2021...
Страница 52: ...TrinityHighway com 51 Revision D March 2021 Shim Kit 627518...
Страница 53: ...TrinityHighway com 52 Revision D March 2021 Fender Panel Assembly 608241...
Страница 54: ...TrinityHighway com 53 Revision D March 2021 Nose Assembly 627522...
Страница 55: ...TrinityHighway com 54 Revision D March 2021 End Shoe Transition 627729...
Страница 56: ...TrinityHighway com 55 Revision D March 2021 31 W Beam Guardrail Transition QFMTSCVR TWLR...
Страница 57: ...TrinityHighway com 56 Revision D March 2021 Thrie Beam Transition QFMTSCVR TTLR...
Страница 58: ...TrinityHighway com 57 Revision D March 2021 Safety Shape Barrier Transition QFMTSCVR T4LRF...
Страница 59: ...TrinityHighway com 58 Revision D March 2021 Single Slope Transition QFMTSCVR T6LRF...
Страница 60: ...TrinityHighway com 59 Revision D March 2021 QuadGuard M Wide TS w Block QFMTSCVR UVB...
Страница 61: ...TrinityHighway com 60 Revision D March 2021 Vertical Barrier Transition QFMTSCVR ESLR...
Страница 62: ...TrinityHighway com 61 Revision D March 2021 TS Concrete Pad w Block 627903...
Страница 63: ...TrinityHighway com 62 Revision D March 2021...
Страница 64: ......