background image

20 

 

 

 

 

 

ANLEITUNG 04_21

  

 

List of Figures: 

Figure 1: Label .................................................................................................................................................................................................... 6 
Figure 2: Circuit Diagram 108 CELLS- HALF-CUT-PERC............................................................................................................... 9 
Figure 3: Tilt Angle ......................................................................................................................................................................................... 10 
Figure 4: Series Connection ....................................................................................................................................................................... 11 
Figure 5: Parallel Connection ..................................................................................................................................................................... 11 
Figure 6: Grounding Symbol ...................................................................................................................................................................... 13 
Figure 7: Grounding ....................................................................................................................................................................................... 13 
Figure 8: Mounting with screws ............................................................................................................................................................. 14 
Figure 9: Load Capacity   Screw outer mounting holes .............................................................................................................. 14 
Figure 10: Load capacity   Screw inner mounting holes .............................................................................................................. 15 
Figure 11: End clamp ...................................................................................................................................................................................... 15 
Figure 12: Center clamp .............................................................................................................................................................................. 15 
Figure 13: Load capacity - Clamping long side ................................................................................................................................... 16 
Figure 14: Load capacity - Clamping short side ................................................................................................................................ 16 
Figure 15: Insertion system - Minimum overlap ............................................................................................................................... 17 
Figure 16: Load capacity - Insertion system - long side ................................................................................................................ 17 
Figure 17: Load capacity - Insertion system - short side ............................................................................................................. 17 
 

List of Tables: 

Table 1: Recommended unpacking method   horizontally packed modules ........................................................................... 4 
Table 2: Recommended unpacking method - vertically packed modules ................................................................................ 5 
Table 3: Tilt Angle ........................................................................................................................................................................................... 10 
Table 4: Maximum reverse current ........................................................................................................................................................ 11 
Table 5: Connection of Modules ............................................................................................................................................................... 12 
Table 6: Approved load capacity   Screw outer mounting holes ............................................................................................. 14 
Table 7: Approved load capacity   Screw  inner mounting holes ............................................................................................. 15 
Table 8: Approved load capacity   Clamping long side .................................................................................................................. 16 
Table 9: Approved load capacity   Clamping short side ............................................................................................................... 16 
Table 10: Approved load capacity   Insertion long side ................................................................................................................. 17 
Table 11: Approved load capacity   Insertion short side ............................................................................................................... 17 

 
 
 
 
 
 
 
 
 
 
 
 

TRIMAX Solar GmbH 
Leitzstraße 45 
70469 Stuttgart 
GERMANY 
Tel : +49 711 490 66 278 
Mail : [email protected] 
Web : trimax-solar.com 
 

Содержание Solar TMX-MH7-120

Страница 1: ...1 ANLEITUNG 04_21 INSTALLATION AND OPERATING INSTRUCTIONS TRIMAX Solar GmbH Leitzstra e 45 70469 Stuttgart GERMANY Tel 49 711 490 66 278 Mail info trimax solar com Web trimax solar com...

Страница 2: ...ical installation 8 PLANNING AND INSTALLATION 9 Intended use 9 Shading 9 Tilt Angle 10 Glare behavior Glare assessment 10 Bifacial Modules 10 Electrical design 10 System dimensioning 11 Connectors 12...

Страница 3: ...es and ensure that this manual is accessible to the operator at all times Pass the manual on to any subsequent owner or user of the solar modules We reserve the right to make changes to the product sp...

Страница 4: ...the horizontal packing tapes 2 Place the pallets one by one 6 Carefully press the stack against a stand Not included 3 Remove the outer packing tapes 7 Cut the remaining packing tapes 4 Remove the co...

Страница 5: ...ove the lid and detach the outer carton 6 Carefully press the stack against a stand Not included 3 Remove the outer carton 7 Cut the remaining packing tapes 4 Place the stand on the glass side of the...

Страница 6: ...tructions including those given by other component suppliers Please contact our Technical Service if you have any questions about the instructions Fire protection TRIMAX Solar PV modules have been tes...

Страница 7: ...r open fire or flammable and explosive gases substances Only use plugs and sockets of the same manufacturer and type Only use devices plugs cables and support frames that are suitable for use in a sol...

Страница 8: ...current generation Do not install operate damaged modules as contact with the surface of the module or frame may cause electric shock Do not attempt to repair a module with broken glass or defective...

Страница 9: ...plants or trees or soiled by soil Lightning protection is recommended for PV systems that are to be installed in locations with a high probability of lightning strikes Shading The modules should not...

Страница 10: ...a professional provider for a glare assessment TRIMAX Solar high performance PV modules are coated with an ARC Anti Reflective Coating The glass coating with nano technology ensures that less light i...

Страница 11: ...orientation of the module For this purpose a complete simulation for the specific site with long term weather data is required Maximum number of interconnected PV modules When modules are connected i...

Страница 12: ...by the cable management system is not covered by the warranty When selecting the size of the cables connecting the module strings to the solar inverter observe the electrical parameters specified on...

Страница 13: ...d according to the manufacturer s instructions Design substructure For rooftop systems always make sure the roof structure is suitable before installing the modules on a roof Make sure that the module...

Страница 14: ...ing holes provided should be used Recommended to use corrosion resistant stainless steel screws 1 screw size and length M8x16mm 2 washer size M8 3 spring washer size M8 4 nut size M8 Torque 14 Nm 20 N...

Страница 15: ...unting holes Mounting with clamping systems Mounting with clamp systems can be done on both sides of the module frame Use at least 4 clamps per module two on both long sides or two on each short side...

Страница 16: ...ative 1800 Pa Table 9 Approved load capacity Clamping short side Mounting with insertion systems TRIMAX PV modules are compatible with insertion systems from selected manufacturers Installation method...

Страница 17: ...on profile Figure 15 Insertion system Minimum overlap Load capacity support on the long sides Figure 16 Load capacity Insertion system long side Module Type Maximum mechanical load TMX MH7 120 TMX MH7...

Страница 18: ...months to ensure they are clean secure and undamaged Check that mounting hardware terminal screws and grounding components are tight and not affected by corrosion Replacement modules must be of the s...

Страница 19: ...ne must not be used Module at end of life Please hand in electrical equipment that is no longer required for disposal at the designated collection points For information on where to dispose of the equ...

Страница 20: ...Insertion system long side 17 Figure 17 Load capacity Insertion system short side 17 List of Tables Table 1 Recommended unpacking method horizontally packed modules 4 Table 2 Recommended unpacking me...

Отзывы: