Product manual EM converterLED ST | 08-2018 | 1.0 | en
Settings for emergency tests
c
19 / 38
Annotation:
(1) First connection to the power supply
(2) Phase, in which the power supply is switched on and off (possibly numerous times)
(3) Phase, in which the power supply is "permanently" connected (no interruption for at least 5 days)
(4) Delaying the commissioning test for 1-28 day
(5) Commissioning test begins
(6) First function test
(7) First duration test
...