26
Maintenance
© Travis Industries
5/9/19 - 1490
PB 36/44 CF MV Operation
Ember Material Installation (GSR2 ONLY)
Once the ember glass installation is complete, place a generous amount of ember material on
the firebox floor on either side of the firebox. Completely cover any visible metal on the firebox
floor.
NOTE:
Make sure no ember material is placed directly on the burner.
HINT:
Add a few randomly placed ember chunks over the ember bed glass to produce a more
realistic appearance.