Maintenance
13
© Travis Industries
5/9/19 - 1490
PB 36/44 CF MV Operation
ProBuilder 36 Log Set Installation
Installation Warnings
NOTE
: Consult the installation manual for order of installation. If using propane (LP), convert the
appliance before installing the log set. If using firebacks, install them prior to installing the log
set.
The logs are fragile, especially after being exposed to heat.
Make sure the gas control valve is OFF and the heater is cool prior to installing logs.
Failure to position the parts in accordance with these diagrams or failure to use only parts
specifically approved with this appliance may result in property damage or personal injury.
The burner must be correctly positioned before installing the log set. Make sure the burner is fully
seated and the pilot is properly aligned. See owner’s manual for details on burner removal.
Log Set Overview
When installed, the (8) logs should appear as shown below. The directions on the following pages detail
installation of this log set.
Rear Log
250-04842
Front Right Ember Chunk
250-04848
Right Log
250-04846
Right Front
Twig
250-04847
Front Left Ember Chunk
250-04845
Left Log
250-04843
Center Log
250-04844
Right Rear Twig
250-04849