background image

3.2 VERTICAL DOWNFLOW

Conversion to Vertical Downflow:

 A  vertical  upflow  unit  may  be 

converted to   vertical downflow. Remove the door and indoor coil and 
reinstall 180° from original position. See Fig.8.

IMPORTANT:

 To comply with certification agencies and the National 

Electric  Code  for  downflow  application,  the  circuit  breaker(s)  on 
field-installed electric heater kits must be re-installed per procedure 
below so that the breaker switch “on” position and marking is up and, 
“off” position and marking is down.

To  rotate  breaker(s):  Rotate  one  breaker  set  (circuit)  at  a  time 
starting with the one on the right. Loosen both lugs on the load 
side of the breaker. (Make sure that wires are identified and are 
reinstalled into proper breaker).Wires are bundled with wire ties, 
one bundle going to the right lug and one bundle going to the left 
lug. 

Using  a  screwdriver  or  pencil,  lift  white  plastic  tab  with  hole 
away  from  breaker  until  breaker  releases  from  mounting 
opening. 

With breaker held in hand, rotate breaker so that “on” position 
is  up,  “off”  position  is  down  with  unit  in  planned  vertical 
mounting position. insert right wire bundle into top right breaker 
lug, ensuring all strands of all wires are inserted fully into lug, 
and no wire insulation is in lug. 

Tighten lug as tight as possible while holding circuit breaker. 
Check wires and make sure each wire is secure and none are 
loose. Repeat for left wire bundle in left top circuit breaker lug.

Replace  breaker  by  inserting  breaker  mounting  tab  opposite 
white  pull  tab  in  opening,  hook  mounting  tab  over  edge  in 
opening.

With  screwdriver  or  pencil,  pull  blue  tab  with  hole  away  from 
breaker while setting that side of breaker into opening.  When 
breaker  is  in  place,  release  tab,  locking  circuit  breaker  into 
location in opening.

Repeat above operation for remaining breaker(s) (if more than 
one is provided).

Replace single point wiring jumper bar, if it is used, on line side 
of breaker and tighten securely.

Double check wires and lugs to make sure all are secure and 
tight. Check to make sure unit wiring to circuit breaker load lugs 
match that shown on the unit wiring diagram. 

6

3 APPLICATIONS

3.1 VERTICAL UPFLOW

Vertical Upflow configuration  is  the factory set on all models.See 
Fig.6.

 If return air is to be ducted, install duct flush with floor. 
Use  fireproof  resilient  gasket  1/8  to  1/4  in.  thick  between  the 
ducts, unit and floor. Set unit on floor over  opening.

Horizontal right is the default factory configuration for the units.
Horizontal left isn’t the default factory configuration for the units.
Conversion to Horizontal left: A vertical upflow unit  may be converted 
to horizontal left by removing indoor coil assembly and reinstalling 
coil as shown for left hand air supply. 

Rotate unit into the downflow position, with the coil compartment 

on top and the  blower compartment on bottom. See Fig. 8.

Reinstall the indoor coil 180° from original position. Ensure the 

retaining channel is fully engaged with the coil rail. See Fig. 8.

Secondary  drain  pan  kits  are  recommended  when  the  unit  is 

configured  for  the  horizontal  position  over  a  finished  ceiling 

and/or living space.   

Fig.7 DIMENSIONS FOR FRONT CONNECT COIL

CAUTION

When using the unit with electrical heater, the switch is used only 
for electrical heater on the front of panel.

IMPORTANT NOTE

Torque applied to drain connections should not 
exceed 15ft.lbs.See Fig.6&7.

3.3 HORIZONTAL

5/16

2-15/16

1-3/8

1-1/4

5/16

2-13/16

1-9/16

2-3/4

Содержание Oxbox J4AC4018A1

Страница 1: ...tion or operation Failure to follow these instruction may result in improper installation adjustment service or maintenance possibly resulting in fire electrical shock property damage personal injury...

Страница 2: ...orizontal left or downflow Multiple electrical entry locations Field installed electric heater kits 5 7 5 10 15 20 kW available as an accessory Dual front panel design for ease of maintenance Blower a...

Страница 3: ...e possibly resulting in fire electrical shock property damage personal injury or death The unit must be permanently grounded Failure to do so can result in electrical shock causing personal injury or...

Страница 4: ...lications Top and side power and control wiring accessible screw terminals for control wiring all combine to make the installation easy and minimize installation cost See Fig 6 2 GENERAL CAUTION Make...

Страница 5: ...as insulation so that the thickness is more than 2 in and fits inside the installation space opening Respectively condensation may form on the surface of the insulation Be sure to use insulation that...

Страница 6: ...5 8 500 21 5 8 550 18 456 UPFLOW UNIT SHOWN UNIT MAY BE INSTALLED UPFLOW DOWNFLOW HORIZONTAL RIGHT OR LEFT AIR SUPPLY Fig 6 DIMENSIONS SUPPLY AIR FLANGES ARE PROVIDED FOR FIELD INSTALLATION ELECTRICA...

Страница 7: ...ay from breaker while setting that side of breaker into opening When breaker is in place release tab locking circuit breaker into location in opening Repeat above operation for remaining breaker s if...

Страница 8: ...ont service panel removed view AIRFLOW AIRFLOW Fig 9 INDOOR COIL AND DRAIN PAN SET UP HORIZONTAL ADAPTER KIT VAPOR LINE CONNECTION LIQUID LINE CONNECTION PRIMARY DRAIN CONNECTION VERTICAL DRAIN PAN AU...

Страница 9: ...en installed in accordance with electrical codes to the unit cabinet Grounding may also be accomplished by attaching ground wire s to ground lug s provided in the unit wiring compartment Ground lug s...

Страница 10: ...W Heat Strip 24 36 60 24 36 60 24 36 60 2 7 5kW Heat Strip 3 10kW Heat Strip 4 5 15kW Heat Strip double Breaker panel 20kW Heat Strip double Breaker panel 36 60 36 60 240 208 240 208 5 29 9 26 4 30 30...

Страница 11: ...32 1 38 1 43 1 47 1 54 1 59 1 64 SCFM 1103 1073 1036 998 967 934 896 855 814 Power W 233 241 249 258 265 275 281 286 291 Current A 1 97 2 03 2 09 2 16 2 22 2 29 2 34 2 37 2 41 SCFM 898 752 603 511 405...

Страница 12: ...1284 1226 1151 1076 946 904 893 869 Power W 143 151 159 168 177 191 197 195 194 Current A 1 23 1 26 1 33 1 41 1 50 1 61 1 63 1 61 1 62 SCFM 1531 1477 1418 1366 1299 1239 1138 1064 1001 Power W 200 211...

Страница 13: ...return ductwork grills special filters accessories etc are accounted for in total resistance See airflow performance tables in this manual Design the duct system in accordance with ACCA Manual D Desig...

Страница 14: ...recommended that a professional installation technician is contacted to ensure installation of these such filtration systems are installed correctly IMPORTANT Do not double filter the return air duct...

Страница 15: ...R MANUAL BOLT 9 FILTER INSTALLATION DIMENSIONS AIR FILTER REMOVAL DIMENSIONAL DATA 1 Remove bolts manually remove air filter recover see in Fig 12 2 Hold the edge of the air filter and extract out 3 C...

Страница 16: ...the air conditioner with the ground observe the local codes 5 If necessary use the power fuse or the circuit breaker or the corresponding scale ampere Fig 13 AIR FILTER CLEAN Fig 14 CONTROL WIRING FO...

Страница 17: ...ings CAUTION NOT SUITABLE FOR USE ON SYSTEMS EXCEEDING 150V TO GROUND ATTENTION NE CONVIENT PAS AUXINSTALLATIONS DE PLUS DE 150V ALA TERRE FM NOTES 1 Use Copper Wire 75 Min Only Between Disconnect Swi...

Страница 18: ...CK FL FL BLUE BLUE 4 1 3 2 CB1 60A W1 WHITE L1 L2 L1 L2 BLUE RED LS LS ELEMENTS ELEMENTS BROWN BLACK 1 2 3 4 5 6 0 15kW HEAT KIT 10kW 5kW HEATER KIT PLUG 4 8 2 6 C 1 0 1 BLACK YELLOW 4 8 2 6 RELAY2 YE...

Страница 19: ...60A1C00A 090 factory installed This coil comes with a factory installed piston metering device See Table 1 for factory installed piston size Some system combinations will require a different sized pis...

Страница 20: ...19 13 7 70 37 32 26 21 16 10 65 38 34 29 24 19 13 60 40 36 31 27 22 17 55 41 37 34 30 26 21 Superheat F Indoor Temperature F Dry Bulb wet Bulb Outdoor Temp F Charge the system by superheat when using...

Отзывы: