LPC-SVX01C-EN
41
installation
procedure
Installation
Step 3.
Line up the holes on the unit and module
and attach together using a #10 - 16 x 0.5
inch screw.
Step 4.
Line up the corner brackets on the
module being joined.
Step 5.
Attach the corner brackets using a bolt
and nut.
Note: Gasketing is not required on these
units. The Packaged Climate Changer is
designed and tested to be used without
gasketing. All screws, nuts, and bolts
required for installation are field supplied.
Содержание LPC
Страница 50: ...50 LPC SVX01C EN Operation general information Figure O GI 9 Tracer AH540 termination board ...
Страница 89: ...LPC SVX01C EN 89 Operation sequence of operation Table O SO 19 Comm LED yellow Table O SO 20 Required inputs ...
Страница 91: ...LPC SVX01C EN 91 Maintenance diagnostics Table M D 2 Tracer AH540 541 diagnostics ...
Страница 92: ...92 LPC SVX01C EN Maintenance diagnostics Table M D 2 continued Tracer AH540 541 diagnostics ...
Страница 94: ...94 LPC SVX01C EN Maintenance troubleshooting Table M T 2 Valves stay open ...
Страница 95: ...LPC SVX01C EN 95 Maintenance troubleshooting Table M T 3 Valves stay closed ...
Страница 96: ...96 LPC SVX01C EN Maintenance troubleshooting Table M T 4 Outdoor air damper stays open ...
Страница 97: ...LPC SVX01C EN 97 Maintenance troubleshooting Table M T 5 Outdoor air damper stays closed ...
Страница 98: ...98 LPC SVX01C EN Maintenance troubleshooting Table M T 6 DX cooling binary outputs do not energize ...
Страница 99: ...LPC SVX01C EN 99 Maintenance troubleshooting Table M T 7 Electric heat binary outputs do not energize ...
Страница 104: ...104 LPC SVX01C EN Maintenance appendix Figure M A 1 Flowchart EnteringWaterTemperature Sampling Function ...
Страница 107: ...LPC SVX01C EN 107 Maintenance appendix Table M A 6 Hard wired CO2 sensor values ...
Страница 109: ......