40
LPC-SVX01C-EN
installation
procedure
Installation
Attaching optional sections to
the model LPC
Note: Gasketing is not required on this
equipment. The Packaged Climate
Changer was designed and tested to be
used without gasketing.
Note: All screws, nuts, & bolts required for
installation are field-provided.
Step 1.
Connect modules to flange on top of unit.
Step 2.
Use the flange on both sides of the unit to
connect modules.
main unit
Содержание LPC
Страница 50: ...50 LPC SVX01C EN Operation general information Figure O GI 9 Tracer AH540 termination board ...
Страница 89: ...LPC SVX01C EN 89 Operation sequence of operation Table O SO 19 Comm LED yellow Table O SO 20 Required inputs ...
Страница 91: ...LPC SVX01C EN 91 Maintenance diagnostics Table M D 2 Tracer AH540 541 diagnostics ...
Страница 92: ...92 LPC SVX01C EN Maintenance diagnostics Table M D 2 continued Tracer AH540 541 diagnostics ...
Страница 94: ...94 LPC SVX01C EN Maintenance troubleshooting Table M T 2 Valves stay open ...
Страница 95: ...LPC SVX01C EN 95 Maintenance troubleshooting Table M T 3 Valves stay closed ...
Страница 96: ...96 LPC SVX01C EN Maintenance troubleshooting Table M T 4 Outdoor air damper stays open ...
Страница 97: ...LPC SVX01C EN 97 Maintenance troubleshooting Table M T 5 Outdoor air damper stays closed ...
Страница 98: ...98 LPC SVX01C EN Maintenance troubleshooting Table M T 6 DX cooling binary outputs do not energize ...
Страница 99: ...LPC SVX01C EN 99 Maintenance troubleshooting Table M T 7 Electric heat binary outputs do not energize ...
Страница 104: ...104 LPC SVX01C EN Maintenance appendix Figure M A 1 Flowchart EnteringWaterTemperature Sampling Function ...
Страница 107: ...LPC SVX01C EN 107 Maintenance appendix Table M A 6 Hard wired CO2 sensor values ...
Страница 109: ......