Contents
1
1.1
1.2
Transportation and storage.........................................................................7
1.3
Delivery content, optional equipment and accessories.............................11
1.4
2
2.1
Heat pump technical data.........................................................................13
3
3.1
3.2
3.3
System design and sizing the heat pump................................................ 18
3.4
Connections and dimensions....................................................................18
3.5
S380 HC+, S490 HC, S490 HC+ and S580 HC evaporator inlet
3.6
3.7
3.8
4
4.1
Prerequisites for commissioning...............................................................29
4.2
4.3
4.4
Checking safety valve blow-off pipe......................................................... 31
4.5
4.6
Checking electrical connections and the control cabinet..........................31
4.7
4.8
Commissioning the system.......................................................................34
4.9
Network and internet connections............................................................ 36
4.10 Master–Slave operation: setting up parallel units.....................................37
4.11 Setting up distribution condenser/subcooler.............................................39
5
5.1
5.2
5.3
5.4
Coefficient of performance........................................................................44
5.5
5.6
5.7
5.8
Cold side settings and warm side settings...............................................51
5.9
Language, Date and Time, and Ethernet settings....................................53
EXES01 2150EN
1 (66)