Installation: Electrical
3. Use copper conductors to connect the 3-phase power supply to the remote or unit-
mounted starter panel.
CAUTION
Use Copper Conductors Only!
Unit terminals are not designed to accept other types of conductors. Failure to use
copper conductors may result in equipment damage.
4. Size the power supply wiring in accordance with the Minimum Circuit Ampacity
(MCA) shown on the unit nameplate.
(MCA = (RLA x 1.25) + Control Power Load)
5. Make sure that the incoming power wiring is properly phased; each power supply
conduit run to the starter must carry the correct number of conductors to ensure
equal phase representation. See Figure 26.
6. As you install the power supply conduit, make sure that this position does not in-
terfere with the serviceability of any of the unit components, nor with structural mem-
bers and equipment.
Also, assure that the conduit is long enough to simplify any servicing that may be nec-
essary in the future (for example, starter removal).
Note:
Use flexible conduit to enhance serviceability and minimize vibration transmis-
sion.
Circuit Breakers and Fusible Disconnects
Size the circuit breaker or fuse disconnect in compliance with NEC or local guidelines.
Figure 26. Proper phasing for starter power supply wiring and conduit loading
CVGF-SVX03B-EN
77
Содержание CVGF1000
Страница 6: ...TRMM Tracer Communications UCP Unit Control Panel CVGF SVX03B EN 6 General Information...
Страница 125: ......
Страница 126: ......
Страница 127: ......