Installation: Mechanical
4. Install hoist ring on to the lifting connection on the waterbox. Torque to 135 Nm (100
ft-lbs) for M20x2.5 (mm) threaded connection, and 37Nm (28 ft-lbs) for M12 x1.75
(mm) threaded connection.
5. Disconnect water pipes, if connected.
6. Remove waterbox bolts.
7. Lift the waterbox away from the shell.
Figure21: Water Box Rigging and Lifting – Vertical Lift Only
1 = Cables, chains or slings
2 = Eyebolt connection (See figure 22 and 23)
3 = Waterbox
1
2
3
WARNING
OVERHEAD HAZARD
Never stand below or in close proximately to heavy objects while they are suspended
from, or being lifted by, a lifting device. Failure to follow these instructions could re-
sult in death or serious injuries.
8. Store waterbox in a safe and secure location and position.
Do not leave waterbox suspended from lifting device.
Reassembly
Once service is complete the waterbox should be reinstalled on the shell following
all previous procedures in reverse. Use new o-rings or gaskets on all joints after thor-
oughly cleaning each joint.
CVGF-SVX03B-EN
58
Содержание CVGF1000
Страница 6: ...TRMM Tracer Communications UCP Unit Control Panel CVGF SVX03B EN 6 General Information...
Страница 125: ......
Страница 126: ......
Страница 127: ......