background image

27

RLC-SVX023B-GB

Operating Principles Mechanical

This section contains an overview of the operation and maintenance of RTSF chillers equipped with microcomputer-
based control systems. It describes the overall operating principles of the design. Following the section is 
information regarding specifi c operating instructions, detailed descriptions of the unit controls and options and 
maintenance procedures that must be performed regularly to keep the unit in top condition. Diagnostic information 
is provided to allow the operator to identify system malfunctions.

Note: 

To ensure proper diagnosis and repair, contact a qualifi ed service organization if a problem should occur.

General

The unit is mono compressor, single circuit, water- cooled liquid chillers. These units are equipped with unit mounted 
starter/control panels. The basic components of RTSF unit are:

•  Unit-mounted panel containing starter and Tracer UC800 controller and Input/output LLIDS
• Helical-rotary compressor
• Evaporator
•  Electronic expansion valve
• Water-cooled condenser
•  Oil supply system
•  Oil cooler (application dependent)
•  Related interconnecting piping
•  AFD (Adaptive Frequency Drive)

Refrigeration (Cooling) Cycle

The refrigeration cycle of the chiller is conceptually similar to that of other Trane chiller products. It makes use of a 
BPHE evaporator.

The compressor is a twin-rotor helical-rotary type. It uses a suction gas-cooled motor that operates at lower motor 
temperatures under continuous full- and part-load operating conditions. An oil management system provides oil-free 
refrigerant to the BPHE to maximize heat transfer performance, while providing lubrication and rotor sealing to the 
compressor. The lubrication system ensures long compressor life and contributes to quiet operation.

Condensing is accomplished in BPHE.

Refrigerant is metered through the fl ow system using an electronic expansion valve that maximizes chiller effi ciency 
at part load.

A unit-mounted starter AFD and control panel is provided on every chiller. Microprocessor-based unit control 
modules (Tracer UC800) provide for accurate chilled BPHE water control as well as monitoring, protection and 
adaptive limit functions. The “adaptive” nature of the controls intelligently prevents the chiller from operating 
outside of its limits, or compensates for unusual operating conditions, while keeping the chiller running rather 
than simply tripping due to a safety concern. When problems do occur, diagnostic messages assist the operator 
in troubleshooting.

Содержание CITY RTSF Series

Страница 1: ...RLC SVX023B GB Water cooled Liquid Chillers with Helical Rotary Compressors RTSF 180 385kW R1234ze July 2020 Confidential and proprietaryTrane information Original instructions...

Страница 2: ...8 Installation Mechanical 10 Installation Electrical 21 Operating Principles Mechanical 27 Typical Operating map 32 Controls TracerTD7 Operator Interface 33 Pre Start Checkout 34 Unit Start up 36 Per...

Страница 3: ...hapter Installation Insure to do not exceed test pressure by using appropriate device 2 Disconnect all power supplies before any servicing on the unit 3 Service work on the refrigeration system and th...

Страница 4: ...lass electronic expansion valve and charging valves on the RTSF The evaporator and condenser are manufactured in accordance with Pressure Equipment Directive standards The evaporator and the condenser...

Страница 5: ...ator A B Evaporator B C Evaporator C D Evaporator D Digit 22 23 24 Not Used Digit 25 Evaporator Water side Pressure X 10 Bar Evaporator Water Pressure Digit 26 Evaporator application N Comfort Cooling...

Страница 6: ...S Special test Digit 49 Installation Accessory X Without 1 Neoprene isolators 4 Neoprene pads Digit 50 Connection Accessory X Grooved pipe connection W Grooved pipe with coupling and pipe stub Digit 5...

Страница 7: ...Type BPHE BPHE BPHE BPHE BPHE BPHE Evaporator model C B B A A A Evaporator Water Content volume l 52 59 69 92 92 92 Evap Water Flow rate Minimum 4 l s 3 6 4 8 4 8 6 4 6 4 6 4 Evap Water Flow rate Maxi...

Страница 8: ...er outlet 9 Evaporator water inlet 13 External control wiring cable gland plate for customer wiring 14 Compressor 15 Discharge line 16 Unit nameplate on the side of starter control panel 17 EXV 18 Con...

Страница 9: ...Supply and install refrigerant pressure relief piping from the pressure relief to the atmosphere Start the unit under supervision of a qualified service technician Where specified supply and insulate...

Страница 10: ...Eliminators Provide rubber boot type isolators for all water piping at the unit Provide flexible conduit for electrical connections to the unit Isolate all pipe hangers and be sure they are not suppo...

Страница 11: ...ped with the unit Figure 1 Handling YES NO 930 1042 Isolation Pads 1 The elastomeric pads shipped as standard are adequate for most installations For additional details on isolation practices consult...

Страница 12: ...ng Water Connections is prohibited It is critical to keep the factory layout for water connections Therefore reversing water connections may lead to functional disorder NOTE Dimensions of tube stub fo...

Страница 13: ...aporator damage do not exceed 10 bar evaporator water pressure for standard units To prevent heat exchangers damage install a strainer in the evaporator water inlet piping Condenser Piping Components...

Страница 14: ...General guidelines for flow switch installation are outlined below Mount the switch upright with a minimum of 5 pipe diameters of straight horizontal run on each side Do not install close to elbows o...

Страница 15: ...L s RTSF condensers Pressuredrop on waterside A B C D 1 10 100 1000 1 0 10 0 100 0 Pressure Drop kPa WaterFlow L s RTSF evaporators Pressuredrop on waterside A B C D Installation Mechanical RTSF cond...

Страница 16: ...nd LWTC Low WaterTemperature Cutout control setpoints based on the concentration of the freeze inhibitor or solution freeze point temperature Avoid the use of very low or near minimum chilled fluid fl...

Страница 17: ...20 6 15 0 17 1 17 9 14 3 38 21 8 20 6 15 0 18 8 19 6 15 0 40 23 8 20 6 15 0 20 7 20 6 15 0 42 25 9 20 6 15 0 22 6 20 6 15 0 44 28 1 20 6 15 0 24 8 20 6 15 0 45 29 3 20 6 15 0 25 9 20 6 15 0 46 30 5 2...

Страница 18: ...ater temperature CAUTION In case of low evaporator leaving water temperature applications the non use of glycol on the condenser side may result in condenser plate freeze up Condenser Water Regulation...

Страница 19: ...ethod if the chiller temperature requirements can be maintained Advantage Excellent control by maintaining constant water flow through the condenser Disadvantage Higher cost because of the dedicated p...

Страница 20: ...ain the following settings and manual overrides for user adjustments and commissioning all under one tab Off State Output Command 0 10 Vdc 0 1 volt increments Default 2 0 Vdc Output Voltage Desired Mi...

Страница 21: ...its which are equipped with variable frequency drive 0V DC before touching any internal components Failure to follow these instructions could result in death or serious injury For additional informati...

Страница 22: ...cable bi material connecting devices are mandatory Cable routing inside control panel should be made case by case by installer Compressor Motor Phase Sequencing Always verify that proper rotation of t...

Страница 23: ...C800 has an input that will accept a contact closure from a proof of flow device such as a flow switch The flow switch is to be wired in series with the chilled water pump starter s auxiliary contacts...

Страница 24: ...seconds 20 minutes of the condenser pump relay energizing an automatically resetting diagnostic Condenser Water Flow Overdue shall be generated which terminates the prestart mode and denergizes the c...

Страница 25: ...ating will go to the RUN UNLOAD operating mode and cycle off Unit operation will be inhibited Re closure of the contacts will permit the unit to automatically return to normal operation NOTE A panic s...

Страница 26: ...e closed when ice building is in progress and open when ice building has been terminated by eitherTracer UC800 or the remote interlock It is used to signal the system changes required to convert to an...

Страница 27: ...ive Refrigeration Cooling Cycle The refrigeration cycle of the chiller is conceptually similar to that of otherTrane chiller products It makes use of a BPHE evaporator The compressor is a twin rotor h...

Страница 28: ...ously lubricant is injected into the compressor for two purposes 1 to lubricate the rolling element bearings and 2 to seal the very small clearances between the compressor s twin rotors Immediately fo...

Страница 29: ...9 Electric expantion valve 10 Sight glass 11 Relief valve 12 Service valve 13 Oil service valve 14 Schraeder valve REFRIGERANT LINE OIL LINE CHILLED HEATED WATER LINE INSULATION PT Pressure transduce...

Страница 30: ...e There is no physical contact between the rotors and compressor housing Oil is injected through adequate ports coating both rotors and the compressor housing interior Although this oil does provide r...

Страница 31: ...oper lubrication and minimize refrigerant condensation in the oil sump heaters are mounted on the bottom of the oil sump An auxiliary contact of the compressor starter energizes these heaters during t...

Страница 32: ...32 RLC SVX023B GB Figure 8 Typical operating map AOC Auxiliary Oil Cooler Typical Operating map...

Страница 33: ...is specific information you need on a day to day basis like setpoints limits diagnostic information and reports Day to day operational information is presented at the display Logically organized grou...

Страница 34: ...2 L3 in the starter to ensure that it has been installed in a A B C phase sequence 5 Fill the evaporator and condenser water circuit Vent the system while it is being filled Open the vents on the top...

Страница 35: ...power on by closing the unit supply power fused disconnect switch 5 Read the phase sequence on the indicator The ABC LED of the phase indicator will glow WARNING It is imperative that L1 L2 and L3 in...

Страница 36: ...eck the evaporator refrigerant pressure and the condenser refrigerant pressure under Refrigerant Report on theTD7 2 Check the EXV sight glasses after enough time has elapsed to stabilize the chiller T...

Страница 37: ...r leakage Make any necessary repairs before starting the unit 6 While the water is circulating adjust the water flow and check the water pressure drops through the evaporator and condenser Refer to wa...

Страница 38: ...emperature 1 to 3 C above that of leaving condenser water at full load Monthly Maintenance and Checks Review operating log Clean all water strainers in both the chilled and condensing water piping sys...

Страница 39: ...stored in metal containers The oil will absorb water if stored in a plastic container Check the pressure drop across the oil filter Refer to Maintenance Procedures Contact a qualified service organiz...

Страница 40: ...aned Thermometers installed in leaving entering water Flow switch installed and checked set Gauges installed in leaving entering water Throttling cock installed in leaving water Cooling water control...

Страница 41: ...stem it will react with the oil to form acids UseTable 6 to determine the acceptability of the oil Trane approved oil is OIL0066E OIL0067E The proper charge amounts are given on General data Note Use...

Страница 42: ...eatly However if the unit has run normal conditions for a long time the minimum and maximum oil levels should correspond to values shown in below table However excessive oil in the system will deterio...

Страница 43: ...il wet or if it is not dry NOTE The remainder of the oil charge can be charged into the 1 4 service valve located at the bottom of the separator if a larger connection is preferred Replacing the Main...

Страница 44: ...line after 2 5 minutes of operation GP2 RTWD Clean Filter Versus Recommended Filter Replacement Line CH530 RTWD Oil Pressure Protection Scheme Recommended replacing filter Clean Filter below this lin...

Страница 45: ...e recovered refrigerant to charge the unit or give it to refrigerant producer for recycling or elimination Evacuation and Dehydration 1 Disconnect ALL power before during evacuation 2 Connect the vacu...

Страница 46: ...xxx 3 x x x x xxx 4 x x x x xxx 5 x x x x x xxx 6 x x x x x xxx 7 x x x x x xxx 8 x x x x x xxx 9 x x x x x xxx 10 x x x x x xxx over 10 every year every year every year 2 x every year 3 every year 40...

Страница 47: ...treatment This Service provides all of the necessary chemicals to properly treat each water system for the period designated The inspections will be conducted at agreed upon intervals andTrane Servic...

Страница 48: ...ion please visit trane com or tranetechnologies com Trane has a policy of continuous product and product data improvement and reserves the right to change design and specifications without notice We a...

Отзывы: