46
RLC-SVX023B-GB
Recommended service routine frequencies
As a commitment to our customers, we have created a wide service network staffed with experienced factory-
authorized technicians. At Trane we offer all the benefi ts of after sales service direct from the manufacturer and we
are committed to our mission statement to provide effi cient customer care.
We would be delighted to discuss your individual requirement with you. For further information regarding Trane
maintenance agreements please contact your local TRANE sales offi ce.
Year
Commis-
sioning
Inspec-
tion visit
Seasonal
shut down
Seasonal
start up
Oil
analysis
(1)
Vibration
analysis
(2)
Annual
mainte-
nance
Preven-
tive main-
tenance
Com-
pressor
R’newal
(3)
1
x
x
x
x
x
xx
2
x
x
x x
xxx
3
x
x
x
x
xxx
4
x
x
x
x
xxx
5
x
x
x
x x
xxx
6
x
x
x
x
x
xxx
7
x
x
x
x
x
xxx
8
x
x
x
x
x
xxx
9
x
x
x
x
x
xxx
10
x
x
x
x
x
xxx
over 10
every year every year every year
(2)
x
every year
3 every
year
40000 h
This timetable is applicable to units operating in normal conditions with an average of 4000 hours per year.
If operating conditions are abnormally severe, an individual timetable must be made for that unit.
(1)
Schedule as per previous analysis result or at least once a year.
(2)
Year 1 to defi ne equipment baseline. Subsequent year based on oil analysis results or schedule as per
vibration analysis.
(3)
Recommended at 40 000 run hours or 100 000 equivalent operating hours whichever comes fi rst.
Schedule also depends on results from oil analysis / vibration analysis.
Seasonal start up and shutdown are mainly recommended for Comfort Air Conditionning and annual and preventive
maintenance are mainly recommended for Process application.