Schedules
Scheduling forTracer SC is based on the BACnet schedule object implementation. For details, see
BACnet standard 135-2008. Scheduling facilitates the following tasks:
•
Creating, editing, and deleting schedules
•
Creating, editing, and deleting calendars and exception schedules
•
Viewing all effective schedules in a facility
The Schedules page, shown in figure 1, contains four tabs: Active Schedules, All Schedules, All
Exceptions, and All Calendars.
Optimal Start/Stop
Optimal start and stop times can be defined for HVAC schedules. HVAC refers to both Area and
equipment.
The schedule coordinates with the Area application or equipment to calculate when the optimal
start and stop occurs. Optimal start/stop times are based on outside air conditions, space
temperature, and occupied setpoints.