BCXC-SVX01A-EN
71
Index
P
power-up sequence 32
pre-installation checklist 8
pre-startup checklist 28
pre-startup procedures 26
R
receiving 28
receiving and handling 7
receiving checklist 7
recommended torques 43
red service LED 49
red service LED activity 49
refrigerant coil piping 18
refrigeration emissions 2
relationship between outdoor tempera-
ture sensors a 38
resistance temperature curve 42
rigging and handling 8
Rover™ service software 29
S
semi-annual maintenance 48
service access 7
service communication wiring 27
ship-separate accessories 7
shipping package 7
skid removal 8
space temperature measurement 41
supply power wiring 20
T
thermostat control interface 29
Tracer Summit with supply fan control
33
Tracer Summit communication wiring
27
Tracer ZN controller sequence of
operation 32
Tracer ZN modes of operation 32
Tracer ZN010 29
Tracer ZN510 and ZN520 29
Tracer communications 27
Tracer controls 29
two and four-pipe changeover opera-
tion 37
U
unit handling procedure 8
unit location 28
unit location recommendations 8
unit mode as related to water tempera-
ture 37
unit mounting 28
unit nameplate 8
unit panels 28
unit piping 28
unit start-up 27
unit startup procedures 28
unit wiring diagrams 20, 58–69
unoccupied mode 32
V
valid operating range and factory
default setpoint 36
valves stay closed 54, 56, 57
valves stay open 54
W
warnings and cautions 2
wiring instructions 26
Y
yellow comm LED 49
yellow comm LED activity 49
Z
ZN520 fan configuration 35
zone sensor 41
zone sensor installation 26
zone sensor maximum wiring dis-
tances 20
zone sensor wiring connections 41
zone sensors without interconnecting
wiring 27