ARTC-SVX001B-EN
57
12. Remove back plate which will allow you to repair
/replace water slinger.
13. Install new water slinger rubber. Replace back
cover.
N
NO
OT
TIIC
CE
E
P
Pu
um
mp
p S
Se
ea
all D
Da
am
ma
ag
ge
e!!
D
Do
o n
no
ott tto
ou
ucch
h sse
ea
all w
wiitth
h b
ba
arre
e sskkiin
n,, o
orr a
allllo
ow
w a
an
ny
y
g
grre
ea
asse
e tto
o cco
om
me
e iin
ntto
o cco
on
ntta
acctt w
wiitth
h tth
he
e n
ne
ew
w sse
ea
all..
E
Ev
ve
en
n a
a ssm
ma
allll p
piie
ecce
e o
off g
grriitt o
off d
diirrtt cca
an
n d
da
am
ma
ag
ge
e tth
he
e
p
pu
um
mp
p sse
ea
all.. W
Wa
assh
h h
ha
an
nd
dss tth
ho
orro
ou
ug
gh
hlly
y p
prriio
orr tto
o
iin
nsstta
alllliin
ng
g tth
he
e n
ne
ew
w sse
ea
all.. L
La
atte
ex
x g
gllo
ov
ve
ess a
arre
e ssu
ug
gg
ge
esstte
ed
d
ffo
orr h
ha
an
nd
dlliin
ng
g o
off p
pa
arrttss a
afftte
err tth
he
ey
y h
ha
av
ve
e b
be
ee
en
n cclle
ea
an
ne
ed
d
a
an
nd
d p
prre
ep
pp
pe
ed
d..
N
No
otte
e:: It is highly recommended that you gather seal
replacement procedural information for your
particular pump make and model.
14. Place the seal, sleeve, spring, and seal retainer onto
the shaft.
15. Position the pump impeller and secure into place
with the impeller retainer bolt.
16. Replace the volute cover with new o-ring and re-
insulate.
17. Re-install pump. Attach the mounting bolts to the
frame using a 1/2 inch wrench or socket.
18. Push the conduit and wires into the knockout on the
electrical box cover.
19. Attach the conduit to the box with the ring nut. Use
a standard screwdriver to secure the nut.
20. Secure the leads with crimp-type bell caps.
21. Reconnect pump electrical connections exactly as
they were notated at removal.
22. Replace the cover onto the electrical box on the side
of the pump motor. Ensure gasket is in place prior
to replacing cover.
23. Reconnect suction and discharge at unions with
appropriate size wrenches as with the removal
process.
24. Open the ball valves on the suction and discharge
sides of the pump.
25. Observe the newly installed pump to verify that all
connections have been seated and tightened
correctly and not leaking.
26. Restore power to the module by removing the
lockout/tagout equipment and turning the pump
module breaker back to the on position.
27. Turn pump on and record amp draws for your
records.
Controller Tasks
Replace PLC Logic Controller
Prior to servicing the controller, verify that the power to
the chiller is disconnected.
1. Remove all quick-connect black plugs and the one
orange plug (power supply 24 Vac).
W
WA
AR
RN
NIIN
NG
G
H
Ha
azza
arrd
do
ou
uss V
Vo
olltta
ag
ge
e!!
F
Fa
aiillu
urre
e tto
o d
diisscco
on
nn
ne
ecctt p
po
ow
we
err b
be
effo
orre
e sse
errv
viicciin
ng
g cco
ou
ulld
d
rre
essu
ulltt iin
n d
de
ea
atth
h o
orr sse
erriio
ou
uss iin
njju
urry
y..
D
Diisscco
on
nn
ne
ecctt a
allll e
elle
eccttrriicc p
po
ow
we
err,, iin
nccllu
ud
diin
ng
g rre
em
mo
otte
e
d
diisscco
on
nn
ne
eccttss b
be
effo
orre
e sse
errv
viicciin
ng
g.. F
Fo
ollllo
ow
w p
prro
op
pe
err
llo
occkko
ou
utt//tta
ag
go
ou
utt p
prro
occe
ed
du
urre
ess tto
o e
en
nssu
urre
e tth
he
e p
po
ow
we
err
cca
an
n n
no
ott b
be
e iin
na
ad
dv
ve
errtte
en
nttlly
y e
en
ne
errg
giizze
ed
d.. V
Ve
erriiffy
y tth
ha
att n
no
o
p
po
ow
we
err iiss p
prre
esse
en
ntt w
wiitth
h a
a v
vo
ollttm
me
ette
err..
2. The PLC logic controller is DIN rail-mounted. Once
plugs are removed, this will expose the gray secure
tabs on the bottom rear of the PLC.
3. Using a flathead screwdriver, insert screwdriver
into the slotted holes on the gray tabs and use
downward force to release PLC.
4. Remove the PLC by lifting the bottom out and then
up, off of the DIN rail.
5. Replace new controller in reverse fashion.
N
No
otte
e:: On a multiple modular system with multiple
PLC’s, it is imperative that the new PLC has the
exact same programming as the remaining
PLC’s or it will not be compatible and would
create havoc within the other PLCs.
6. Energize power to the module by turning power ON
at the breaker and/or disconnect.