18
The slope of water drain hose (1) shall be within 75mm, don't apply too much force on it.
If several water hoses join together, do as per following proceedures.
Specifieations of the water hoses shall meet the requirements for the unit running.
Note:
(2) Check if water drainage is smooth after installation.
• Check whether indoor unit is horizontal with leveler or polythene pipe
filled with water, and check that the dimension of the ceiling opening is
correct. Take off the lever gauge before install the ornament panel.
• Fasten the screws to make the height difference between the two
sides of indoor unit less than 5mm.
• First fix it with screws temporally.
• Fasten the two temporally fixing screws and other two, and tighten the
four screws.
• Connect the wires of synchro-motor.
• Connect the wire of signal.
• If no response of remote controller, check whether the wiring is
correct, restart remote controller 10 seconds after shut off power supply.
• Install the panel board in the direction shown in the figure. The
incorrect direction will result in water leakage, meanwhile swing and
signal receiving are displayed that cannot be connected.
• Charge, through air outlet or inspecting hole, 1200ccd water to see
water drainage.
• Check water drainage in cooling operation.
<Limits of Panel Board Installalion>
After Wiring
AB25S2SC1FA
Method of water charging
Self-provided stiff pipe
Water drainage port for
maintenance
(Drain water from
this hole)
100mm
Watering can of plastic
pipe should be about
100 mm long
Charge water from
inspecting hole
Charge water from
air outlet
Indoor unit
terminal block
Outdoor unit
terminal block
Maintenance
Inspecting hole
AB35S2SC1FA
AB50S2SC1FA
AB25S2SC2FA
AB35S2SC2FA
AB50S2SC2FA
AB50S2SF1FA
AB71S2SG1FA
300mm below
1~1.5m
Clamp
(accessorry)
Over 100
Drain hose
(accessory)
drain water lifting pipe
Suspending bracket
self-provided stiff pipe
75 below
500 below
(accessory)
Connect water hoses
with at joint.
Electric control box
Connect with
outdoor unit
Terminal block
PCB on
indoor unit
Terminal block
Cover of controll box
220 280 below
500 below
AB25S2SC1FA
Method of water charging
Self-provided stiff pipe
Water drainage port for
maintenance
(Drain water from
this hole)
100mm
Watering can of plastic
pipe should be about
100 mm long
Charge water from
inspecting hole
Charge water from
air outlet
Indoor unit
terminal block
Outdoor unit
terminal block
Maintenance
Inspecting hole
AB35S2SC1FA
AB50S2SC1FA
AB25S2SC2FA
AB35S2SC2FA
AB50S2SC2FA
AB50S2SF1FA
AB71S2SG1FA
300mm below
1~1.5m
Clamp
(accessorry)
Over 100
Drain hose
(accessory)
drain water lifting pipe
Suspending bracket
self-provided stiff pipe
75 below
500 below
(accessory)
Connect water hoses
with at joint.
Electric control box
Connect with
outdoor unit
Terminal block
PCB on
indoor unit
Terminal block
Cover of controll box
220 280 below
500 below
Содержание 4TXM2318BF300AA
Страница 102: ...100 PCB 0151800611 4MXE2309BF0W0AA 4MXE2312BF0W0AA...
Страница 116: ...114 PCB 0151800364D Power Module 0011800377C...
Страница 117: ...115 Power Module 0011800377AJ PCB 0151800364C...
Страница 153: ...151 Screw 0010600325 Terminal block 0010452210E Connection cable 0150400330 Install the connection cable like this way...