MD1064 Rev. F
12 of 32
•
Care should be taken to avoid excessive shock when mounting the equipment.
•
The sensitive length shown on the detector should be positioned in the correct
measurement range on the outside of the vessel as shown on the general
arrangement drawings. If this is not possible, then Tracerco must be contacted to
advise on repositioning whilst maintaining optimum performance.
4.1.3
Optimus™ Control Module
The Optimus™ control module is designed
for use in the safe area. It is mounted on Top
Hat 35mm DIN rail in the control cabinet. It is normally mounted beside the HART 4-20mA
repeater power supplies required by the PRI150 radiation detectors.
4.2
Electrical Installation / Wiring
Reference should be made to Tracerco Document DD23870
–
T221 System Diagram.
4.2.1
Source Container(s)
There are no electrical connections to be made to the source container(s).
4.2.2
PRI150 Radiation Detector(s)
The PRI150 radiation detector is approved for use in certain hazardous areas. Details on
regarding hazardous area certification can be found in Appendix A
Particular attention should be given to the essential safety information. This can be found
in Tracerco Document CPI0039.
Figure 6. PRI150 terminals.
Содержание Optimus T221
Страница 1: ...Author Paul Storey Date 10 December 2019 Document no MD1064 F Operation Manual T221 Optimus ...
Страница 32: ......