![TR-Electronic LE-200 Скачать руководство пользователя страница 17](http://html.mh-extra.com/html/tr-electronic/le-200/le-200_user-manual_1146676017.webp)
Commissioning / Installation
Printed in the Federal Republic of Germany
©
TR-Electronic GmbH 2007, All Rights Reserved
14.12.2007
TR - ELE - BA - GB - 0008 - 06
Page 17 of 37
5 Commissioning / Installation
5.1 Electrical connection
Note
At the realization of the electrical connection the references in chapter 1.2.1, starting
from page 7 must be considered.
In order to be able to carry out the connection, the connection cap must be removed
from the laser first.
For this the screws
(A)
are loosened and the cap
(B)
is removed away from the laser.
A
B
A
RD
BA
U
1
20
X1
DIP-Switch
ON
OFF
2
0
2
7
RC
5.1.1 Supply voltage
Pin 7
0V,
GND
Pin 8
Standard: 18 – 27 V DC
Device with heating: 24 V DC (
±
5%)
1 2 3 4 5 6
7 8
9 10 11 12 13 14 15 16 17 18 19 20
5.1.2 Interbus-S
5.1.2.1 Remote IN
Pin 15
GNDI,
reference potential Remote IN
Pin 16
Shield,
internal RC-element onto case
Pin 17
DO1 inverted
Pin 18
DO1
Pin 19
DI1 inverted
Pin 20
DI1
1 2 3 4 5 6
7 8
9 10 11 12 13 14
15 16 17 18 19 20
i