Appendix D: Field Sensor Replacement (continued)
8. Connect the hoses to the sensor. (see picture below)
9. Repeat steps 5 through 8 for the remaining sensor.
10. Install the sensor back panel and re-install the analyzer into the boot.
10. Wait 24 hours prior to starting the analyzer. Make sure batteries are installed
so the sensors are under power. During this time the 717 sensor calibration
data will be transferred and the sensor will have power applied to enable it to
acclimate.
NOTE: YOU MUST WAIT 24 HOURS AFTER SENSOR INSTALLATION BEFORE
TURNING YOUR ANALYZER ON AND USING IT FOR THE FIRST TIME.
FAILURE TO DO SO WILL RESULT IN AN ERROR CODE DISPLAYED AND
THE ANALYZER WILL NOT FUNCTION PROPERLY.
NOTE: FACTORY CALIBRATION ONCE PER YEAR IS STILL RECOMMENDED TO
ENSURE PROPER OPERATION AND ACCURACY OF ALL FUNCTIONS
AND RANGES.