background image

3

7

5

Framing 

Brackets

5

7

Access holes to 

mounting screws

2. Attach Side Studs (Legs)

r "UUBDIUIFPVUFSTJEFTUVET UPUIFUPQ

of the header stud (5). (Fig #20)

r

Fasten the outer side studs (3) at the 

 

bottom using the base plates (7).

 

 

3. Attach the Assembled Frame to 
 

the Unit

r "MJHOUIFBTTFNCMFEGSBNFUPUIFVOJU

 

framing brackets. (Fig #21) Attach 

 

at the fastening points through the 

 

access  holes  in  the  outer  side  studs 
(3).

4. Secure to Existing Framing

r

Secure the frame assembly to existing  
framing through the stud header (5) and 
the stud plates (7).

5. Install Non-combustible Board

r

Use drywall screws to install the 

 

non-combustible board (Fig #22).

Fig. #20

Fig. #21

Fig. #22

13

TC36.CE3 250313-48

Содержание TC36.CARE3

Страница 1: ...e for use with other gases unless a certified kit is used This appliance is suitable for installation in a bedroom or bed sitting room FOR YOUR SAFETY Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance WHAT TO DO IF YOU SMELL GAS r P OPU USZ UP MJHIU BOZ BQQMJBODF r P OPU UPVDI BOZ FMFDUSJDBM TXJUDI r P OPU VTF BOZ QIPOF JO ZPVS CVJMEJ...

Страница 2: ...mination Venting Chart 24 Vent Terminal Clearance 27 Vent Terminal Minimum Clearances 27 Vent Pipe Sealant 28 Insulated Collar Shield Included 28 Vent Restrictor Adjustment 29 Firebox Panels Installation 30 Finishing Touch Trim Kit Instructions 31 Lighting Instructions 32 First Fire 32 Maestro Control System 33 Remote Control Initial Setup 33 Maestro Control System Operation 34 Maintenance 37 TC36...

Страница 3: ... gas control which has been under water Due to high temperatures this gas appliance should be located out of traffic and away from furniture and draperies Children and adults should be alerted to the hazards of high surface temperatures and should stay away to avoid burns or clothing ignition Young children should be carefully supervised when they are in the same room as the appliance Clothing or ...

Страница 4: ...ly vented gas fuelled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OBSTRUCTIONS 4 INSPECTION The state or local gas inspector of the side wall horizontally vented gas fuelled equipment shall not approve the installation unless upon inspection the inspector observes carbon monoxide detectors and sig...

Страница 5: ...on See Figure 2 Mantel support 4 in 102 mm Vertical vent pipe 1 3 4 in 45 mm Horizontal Vent pipe Top sides and bottom 1 3 4 in 45 mm Fig 1 Fig 2 Fig 3 MAY USE COMBUSTIBLE FACING MATERIAL IN THIS AREA NON COMBUSTIBLE FINISH MATERIAL SEE FIG 7 NON COMBUSTIBLE ZONE DO NOT INSTALL ANY COMBUSTIBLE MATERI AL ELECTRICAL WIRING OR GAS PLUMBING IN THIS AREA COMBUSTIBLE FRAMING AND FINISH WALL ABOVE STANDO...

Страница 6: ...proceeding Caution The ceramic glass is very fragile and should be handled with care The window frame is held in place by two spring loaded latches that are operated by a one piece latch handle 1 Remove the TC Finishing Touch Trim Kit from the window frame If installed 2 Using a screwdriver or other similar object push against the notch in the top of the latch and grab the bottom of the latch hand...

Страница 7: ...e gas supply piping may be plumbed Various installations are possible such as into an existing wall a corner a built in wall or a wall projection Fig 7 Due to high temperatures do not locate this fireplace in areas of high traffic or near furniture or draperies The minimum clearances from the fireplace to combustible surfaces must be adhered to and are shown in Fig 2 and Fig 3 Fig 6 TOP STANDOFFS ...

Страница 8: ...ventional lumber Consult local building codes for specific requirements Due to high temperatures non combustible backer board such as cement board or its equivalent must be used to sheet in the front of the fireplace extending 12 above and 5 9 16 to the side of the framing edge bars Fig 9 Standard sheet rock dry wall may be used beyond this If the backer board is not to be finished with othernon c...

Страница 9: ...TION AND DO NOT USE IF CRACKED NOTE IT IS RECOMMENDEDTO PRE DRILL MOUNTING HOLES IN THE BOARD PRIOR TO SECURINGTOTHE FRAMING THISWILL PREVENT THE BOARD FROM CRACKING CALCIUM SILICATE BOARD NON COMBUSTIBLE BOARD DETAIL Fig 9 Fig 10 Fig 11 NON COMBUSTIBLE MATERIALS MUST EXTEND 12 ABOVE AND 5 9 16 TO THE SIDES OF THE FRAMING EDGES MINIMUM COMBUSTIBLE FRAMING DIMENSIONS NOTE FIREPLACE SHOULD BE IN ITS...

Страница 10: ... L 2 5 9193 501 STUD HEADER 49 7 8 L 1 6 9393 001 STUD PLATE 41 1 4 L 1 7 9194 5 BASE PLATE 5 15 16 L 2 1 Top Frame Assembly r Lay out side studs 2 and center studs 4 on a large flat surface Fig 12 r Using the screws provided 1 attach the header stud 5 and the plate stud 6 to the center studs 4 TC36 B2FRKITA Fig 12 1 2 3 4 5 6 7 10 TC36 CE3 250313 48 TC36 Steel Stud Framing Kit ...

Страница 11: ...Assembled Frame to the Unit r MJHO UIF BTTFNCMFE GSBNF UP UIF VOJU framing brackets Fig 14 Attach at the fastening points through the access holes in the outer side studs 3 4 Secure to Existing Framing r Secure the frame assembly to existing framing through the stud header 5 and the stud plates 7 5 Install Non combustible Board r Use drywall screws to install the non combustible board Fig 15 Fig 1...

Страница 12: ... 41 1 4 L 1 7 9194 5 BASE PLATE 5 15 16 L 2 8 9596 ARCH SUPPORT 2 1 Top Frame Assembly r Lay out side studs 2 and center studs 4 on a large flat surface Fig 19 r Using the screws provided 1 attach the header stud 5 and the plate stud 6 to the center studs 4 TC36 BRFRKITA Fig 19 1 2 3 4 5 6 7 8 TC36 Arched Steel Stud Framing Kit 2 2 4 5 6 8 8 Attach together Attachment point Attachment point Attach...

Страница 13: ...Assembled Frame to the Unit r MJHO UIF BTTFNCMFE GSBNF UP UIF VOJU framing brackets Fig 21 Attach at the fastening points through the access holes in the outer side studs 3 4 Secure to Existing Framing r Secure the frame assembly to existing framing through the stud header 5 and the stud plates 7 5 Install Non combustible Board r Use drywall screws to install the non combustible board Fig 22 Fig 2...

Страница 14: ...curing bolts in the upper and lower corners on each side of the lintel and remove the lintel Rotate the assembly to have the desired edge away from the fireplace Fig 23 4 The lintel assembly has a maximum range ofadjustabilityof1 toaccommodatevarying facing material thicknesses The maximum depth is 6 Fig 25 5 The lintel assembly can then be adjusted to align flush with your facing material by slid...

Страница 15: ...r fireplaced must be raised accordingly Caution Hearth extensions thicker than 1 will interfere with the window frame when opening Fig 23 15 TC36 CE3 250313 48 Hearth Extension NON COMBUSTIBLE FINISH MATERIAL Fig 24 FRAMING EDGES GLASS FRAME This fireplace may be recessed up to a maximum depth of 6 this recess must be constructed from non combustible material The space between the outside framing ...

Страница 16: ...ig 26 The fireplace operates on a low voltage supplied by an AC adaptor rated at 110 volts 60Hz 0 25A The optional power vent kit is rated at 115 volts 60Hz 1 8A The electrical wires can be accessed from both inside and outside the control box by removing one of the two small access panels Fig 27 The wires from inside the outlet box are connected to the 110 V AC supply Fig 28 5 Connect the gas sup...

Страница 17: ...screwsintheaccess panel and tighten 20 Remove the pressure gauge and the extension test fitting and thread the pressure test port plug into the pressure test port Thread sealant is required on the threads Refer to burner installation manual 21 Turn the fireplace on and verify that the connections are tight Standing Pilot Function Only for use where permitted The control system on this fireplace is...

Страница 18: ...bled and the LED will not flash to indicate low battery The battery backup must be removed when using a power vent r The Standing Pilot feature will be de activated feature not available when Power Vent Pre Purge Mode is active r Upon receiving any ON command the powerventoutputwillcloseimmediately buttheignitioncyclewillNOTbeginfor10 seconds pre purge This means that themoduleWILLNOTemitasparkand...

Страница 19: ...low for repair or replacement of the gas valve r Check local codes for additional requirements 1 Connect the gas supply to the valve Fig 27 2 Turn on the gas supply and check that all connections are tight and leak free WARNING Use EXTREME CAUTION when using soap and water to do a leak test on the valve fittings There are electronics around and below the valve that can will be damaged if they come...

Страница 20: ...ries of the chart shown in Fig 35 The horizontal run of vent must have a 1 4 rise for every 1 ft of run towards the termination Before installing venting for this unit the installer should read these instructions to insure that the proper vent configuration has been selected Use only Town and Country Termination kits TCVT WTA Wall Termination Kit TCVT RTA Roof Termination Kit Vent system component...

Страница 21: ... 1 2 opening Properly adjusted the thimble should be flush with the outer wall surface TRIM TO LENGTH Fig 36 Vent System Components Town Country 12 Pipe Length TCVT 811X12 18 Pipe Length TCVT 811X18 24 Pipe Length TCVT 811X24 48 Pipe Length TCVT 811X48 12 Adjustable Pipe Length TCVT 811X12ADJ 45 Elbow TCVT 811XLB45 90 Elbow TCVT 811XLB90 Wall Offset Support TCVT 811XOS Wall Termination Kit TCVT WT...

Страница 22: ...re fully engaged and then attach the terminal to the outside wall The vent terminal must not be recessed into the exterior wall or siding 2 Caulk in place to prevent any moisture entering the building NOTE MINIMUM CLEARANCES TO THE VENT TERMINAL MUST BE MAINTAINED see Fig 45 46 Fig 38 HORIZONTAL TERMINAL TCVT 9360 14 1 2 FRAMED OPENING WALL SHIELD THIMBLE TCVT THIMA ELBOW TCVT 811XLB90 24 VENT PIP...

Страница 23: ...f elbows reduce horizontal vent run by 2 feet Ensure vent pipe is properly supported 68 1 2 All dimensions are approximate Both rise and run may vary with different combinations of pipe 24 Pipe length minimum A Minimum rise B Pipe length C Maximum run D Pipe length Max 68 1 2 1 24 20 1 2 1 12 72 3 4 1 12 1 18 75 3 4 1 48 1 12 78 3 4 1 24 1 12 11 2 2 48 1 24 84 3 4 1 24 1 18 15 10 1 2 3 48 1 24 1 1...

Страница 24: ...al 90 elbow or an equal combination of elbows reduce horizontal vent run by 2 feet Ensure vent pipe is properly supported All dimensions are approximate Both rise and run may vary with different combinations of pipe 24 Pipe length minimum A Minimum rise B Pipe length C Maximum run D Pipe length Maximum 68 1 2 1 24 29 1 12 72 3 4 1 12 1 18 75 1 4 1 48 1 12 78 3 4 1 24 1 12 11 1 1 2 2 48 1 24 84 3 4...

Страница 25: ...nally after the vent pipe is in place install a storm collar on top of the shield This will prevent loose insulation from falling into the area between the vent pipe and the shield Vent Pipe 1 Install the first section of vent pipe into the collar on top of the fireplace Secure in place with screws and seal with ap proved HighTemperature self adhesive aluminium tape provided 2 Continueaddingventpi...

Страница 26: ...llar for a snug fit Apply a thick horizontal ring of mastic around the pipe at top of the storm collar Fig 43 3 Lower the roof vent terminal cap over the vent pipe and secure in place with screws provided Fig 43 Seal screw heads and joints with caulking to prevent any moisture entering the venting system VERTICAL TERMINATION CAP TCVT 9365 FLASHING STORM COLLAR TC42 90665 MASTIC NOTE ADJUSTABLE FOR...

Страница 27: ...y M 30 inches 76 cm min Clearance under veranda porch deck or balcony a vent shall not terminate directly above a side walk or paved driveway which is located between two single family dwellings and serves both dwellings only permitted if veranda porch deck or balcony is fully open on a minimum of 2 sides beneath the floor as specified in CGA B149 Installation Codes Note local Codes or Regulation ...

Страница 28: ...nd cover Pt TC36 9709 included must be installed around the vent pipe flush with the top of the unit and secured by fitting tabs through slots and bending over tabs 180 as shown in Fig 60 The parts required are included NOTE bending tabs to 90 away from arc bend prior to installation eases the process INSULATION COVER 2 pcs BEND TABS APPROVED HIGH TEMP SELF ADHESIVE TAPE VENT PIPE 28 TC36 CE3 2503...

Страница 29: ...Restrictor positions are based upon lab tests The ideal position may vary slightly with installation Restrictor position is too closed if the flame has the following characteristics r MBNF JT FYDFTTJWFMZ UBMM BOE MJGUJOH r MBNF MBDLT NPWFNFOU r MBNF TPPUT Restrictor position is too open if the flame has the following characteristics r MBNF IFJHIU JT MPX r MBNF IBT FYDFTTJWF NPWFNFOU To adjust the ...

Страница 30: ...x heat shield The retainer slips between the lip of the firebox and the heat shield and is retained in place by two screws Fig 51 Fig 52 2 Install the Lower Rear Panel PARK AVE BEIGE HERRINGBONE TCPN 36PAC TC36 TCPN 36ARPAC TC36 ARCH MOUNT VERNON RED HERRINGBONE TCPN 36VRC TC36 TCPN 36ARVRC TC36 ARCH MANHATTAN BEIGE STACKED BRICK TCPN 36MNC TC36 TCPN 36ARMNC TC36 ARCH BLACK PORCELAIN TCPN 757031 C...

Страница 31: ...ngling it up into position It may be necessary to push the firebox shield up to allow panel to move freely into place 4 Install the Rear Upper Panel 5 Install the Left Side Panel by inserting the bottom of the panel in first and then angling it up into position 6 Re install the Side Panel Retainers 7 Install the Left and Right Front Panels LEFT SIDE PANEL REAR UPPER PANEL FRONT LEFT PANEL RIGHT SI...

Страница 32: ... use this appliance if any part has been under water Immediately call a qualified service technician to inspect the appliance to replace any part of the control system any gas control which has been under water 310106 5051 173 5 TC30 Hot while in operation Do not touch Severe burns may result Keep children clothing furniture gasoline and other liquids having flammable vapours away Keep burner and ...

Страница 33: ... fireplace by pressing the center button again The handset is now synchronized with the fireplace Initial Settings Time and temperature 1 Press and hold the A1 and A2 buttons at the same time until the temperature symbol flashes Fig 57 2 Use the up and down arrows to set pre ferred temperature units F or C 3 PressOKandthe hour valuewillstart to flash 4 Use the up and down arrows to set the hour va...

Страница 34: ... The center button on the remote control can be used to turn the fireplace ON and OFF With the fireplace off press the center button to turn it on The MAN and flame icons will be displayed on the screen A second push will turn it off The MAN and flame icons will disappear from the screen When the fireplace is on the up and down buttons located above and below the center but ton are used to modulat...

Страница 35: ...1 weekday ON time Fig 63 2 Use the up and down buttons to change the time to the desired ON time 3 By pressing the OK button the P1 week day OFF time will flash Fig 63 4 Use the up and down buttons to set the desired OFF time 5 Press the OK button and the P2 weekday ON time will flash 6 Repeat the process to set the P2 week day P1 weekend and P2 weekend pro grams 7 When the P2 OFF time is set and ...

Страница 36: ...s and hold the thermostat button on the lower right hand side of the hand held remote for 5 seconds Fig 66 The temperature icon on the display will flash Fig 67 3 While the temperature icon is flashing use the up and down arrows to set the temperature to the desired setting 4 Once the desired setting is reached press the OK button If the OK button is not pressed the icon will continue to flash for...

Страница 37: ...retaining clips Annual Inspection a Remove glass panel and inspect the decorative burner media such as logs pebbles glass etc for soot build up If excessive build up of soot is present have a qualified service person inspect and adjust the unit for proper combustion Clean the decorative media and use a brush or vacuum cleaner to clean the burner paying close attention to the burner ports b Check t...

Страница 38: ...ASSY 3 FRAMIMG KIT TC36 BFRKITA ITEM DESCRIPTION PART NO 4 PANEL SETS PARK AVE BEIGE HERRINGBONE TCPN 36PAC MT VERNON RED HERRINGBONE TCPN 36VRC MANHATTAN BEIGE STACKED BRICK TCPN 36MNC BLACK PORCELAIN TCPN 757031 C CB BROWN PORCELAIN TCPN 757031CB C 3 FRAMIMG KIT 3a STEEL STUDS 4 PANEL SETS 4a PANEL LEFT SIDE 4b PANEL UPPER 4c PANEL RIGHT SIDE 4d PANEL LEFT BASE 4e PANEL RIGHT BASE 4f PANEL LOWER...

Страница 39: ...SIDE 4d PANEL LEFT BASE 4e PANEL RIGHT BASE 4f PANEL LOWER BACK 2b 2a 1a 1b 1c 3a 4a 4f 4d 4b 4c 4e 1e 1d 39 TC36 CE3 250313 48 WHEN ORDERING INCLUDE PART NUMBER WITH DESCRIPTION ITEM DESCRIPTION PART NO 1 TC36 ARCH BODY ASSM TC36 CARE 2a GLASS ASSM GLAS 2088ASSY 3 FRAMING KIT TC36 BAR2FRKITA ITEM DESCRIPTION PART NO 4 PANEL SETS PARK AVE BEIGE HERRINGBONE TCPN 36ARPAC MT VERNON RED HERRINGBONE TC...

Страница 40: ...WIRING HARNESS 1g MODULE HOLD DOWN BRACKET 1h PRESSURE TEST ASSEMBLY 1i AC ADAPTOR 1j TC36ST PLATE A 1k TC36ST PLATE B 1l WING NUTS 2 1m TC30 MINIMUM RATE SCREW NG 2a INLET PLATE 2b INLET PLATE GASKET 2c ELEC BULKHEAD GASKET 2d 1 2 BULKHEAD FITTING 2e 1 4 BULKHEAD FITTING 2f ELEC BULKHEAD FITTING 2 BULKHEAD ASSEMBLY KIT 2a INLET PLATE 2b INLET PLATE GASKET 2c ELEC BULKHEAD GASKET 2d 1 2 BULKHEAD F...

Страница 41: ... olt Common wire White 1 4 Male Connector 1 4 Male Connector 1 4 Male Connector 1 4 Male Connector 1 4 Female Connector 1 4 Female Connector 1 4 Female Connector 1 4 Female Connector Wiring the Power V ent Kit provided by T own Country Communication wires Main Pilot Low pressure side egnarO egnarO Pressure switch wire Supplied Power V ent switch wire Supplied kcalB kcalB ST ANDARD A WG 14 2 WIRE O...

Страница 42: ...KET TCVT 93915 STORM COLLAR TC42 90665 WALL SHIELD CEILING FIRESTOP TCVT THIMA Fig 72 WALL TERMINAL TCVT 9360 WALLSHIELD CEILING FIRESTOP THIMBLE TCVT THIMA Fig 70 Fig 71 42 TC36 CE3 250313 48 Wall Termination Kit TCVT THIMA Wall Shield Ceiling Firestop Thimble TCVT RTA Roof Termination Kit ...

Страница 43: ... 16 15 7 8 7 16 1 5 16 8 5 16 13 13 16 12 9 16 13 1 8 11 1 8 TCVT 811X12ADJ TCVT 811XLB45 TCVT 811XLB90 TCVT 811X _ _ 12 PIPE 10 1 4 18 PIPE 16 1 4 24 PIPE 22 1 4 48 PIPE 46 1 4 Fig 73 43 TC36 CE3 250313 48 Vent Pipe Dimensions ...

Страница 44: ...22 3 8 24 PIPE 27 1 8 26 1 2 48 PIPE 44 1 16 43 1 2 Fig 74 ADDING AN ADJUSTABLE SECTION TO PIPE WILL INCREASE OFFSET BY 2 1 8 TO 6 3 4 A B C 12 PIPE 13 7 16 23 1 4 18 PIPE 17 9 16 27 5 8 24 PIPE 21 7 8 31 3 4 48 PIPE 38 3 4 44 7 8 A B 12 PIPE 29 18 PIPE 35 24 PIPE 41 48 PIPE 65 ADDING AN ADJUSTABLE SECTION TO PIPE WILL INCREASE OFFSET BY 3 TO 9 1 2 44 TC36 CE3 250313 48 Vent Offset Chart ...

Страница 45: ...LOOR LIGHTS White White Black Black Fig 75 Light Bulb Replacement 1 Replacement bulbs should only be G6 35 T4 75Watt 2 Remove the screw holding the glass cover in place 3 Use a flat blade screw driver to pull down the end of the cover and remove Fig 76 4 DO NOT TOUCH THE BULB DIRECTLY Use latex gloves or paper towel to remove bulb and replace 5 Replace cover and secure with screw previously remove...

Страница 46: ...Notes 46 TC36 CE3 250313 48 ...

Страница 47: ...Sidewall to Appliance Du mur latéral a l appareil 4 in 4 po 102 mm Ceiling to Appliance Plafond a l appareil 24 in 24 po 610 mm Mantel to Appliance Du manteau al appareil 9 in 9 po 229 mm Maximum Mantel Extension Allongement maximum du manteau 12 in 12 po 305 mm See Installation Manual for more detail Voyez des Directive de l Installation pour plus détaux Mantel Supports Supports du manteau 4 in 4...

Страница 48: ...Printed in Canada Technical support 1 250 748 1184 Web site www townandcountryfireplaces net 2975 Allenby Rd Duncan BC V9L 6V8 ...

Отзывы: