Installation of welding parts

 

Installation of the rear welding bracket

•  After  having  determined  the  center  of  rotation  of  the 

operator with the help of the chart, the rear welding 

bracket 

(2)

 can be installed (please reinforce with a corner  

plate 

(3)

 

Installation of the front welding bracket

•  Please fix the front welding bracket 

(1)

 to the gate wing inconformity with the dimension C. 

Attention: check up-

per-/lower side

 (

see pict.)

•  Make sure that the gate is completely closed, and that the operator will be installed in a level position. 
•  On gate leaves with thin panels or on wooden gate leaves the front welding bracket (1) cannot be directly 

attached to the gate wing. In such cases the front welding bracket has to be connected to a piece sheet 

metal which has been previously mounted to the gate wing.

• 

The operator piston rod is then connected to the welding bracket with the help of a bolt and a Seeger circlip ring. 

•  also the front welding bracket (1) should be reinforced with a corner plate (3).  

2b.  Installation of operator 

Installation

•  after having installed the welding parts 

and 

corner plate

 (3)

  

install the operator as follows:

•  Before mounting make sure that the movable parts on  

the rotation points are lubricated!

•  place  piston  rod 

(KS)

 of operator with drilling of   

ball bearing 

(KL)

 onto the front welding part 

(1) 

and fix with 

snap ring 

(1a)

  
•  now turn the gate leaf as much as the fork 

(G)

 of the operator 

can be suspended onto the rear welding part 

(2) 

•  now insert the bolt/anchor 

(2a)

 from above and fix it with  

snap ring 

(2b)

 .

 

Lubricate movable parts

•  the rotation points of the operator before mounting 

must be well lubricated with HSW100!

  

 (e.g. drillings 

of welding parts and bolts/anchors for mounting the 

operator to the welding parts)  

•  Grease the automation regularly (according to the 

manteinance instructions)

3

1a

KL

3

2a

2b

G

 

IMPORTANT

•  The operator piston rod (KS) must not travel out its 

whole length (at least 5 mm have to remain)! Thus 

the travel of the gate wing has to be limited by floor 

stoppers, or the Tousek piston rod stroke limiting 

device has to be used.

KS

 Important

•  keep backfill of  

welding parts!

V=20mm

1

2

3

3

Содержание SWING 225 AEB/29 N

Страница 1: ...Installation and operating manual Swing gate operator SWING 225...

Страница 2: ...ment The electric motor heats up during operation Therefore the device should only be touched after it has cooled off Please make sure that no other persons are on site of the motorised gate area espe...

Страница 3: ...f the gate in the open and closed position and do normally not require the installation of an electric lock However on some installations it can be necessary to use an additional locking device e g an...

Страница 4: ...perator the piston rod must NOT be completely driven to the limit min 5mm of spare travel In order to increase the strength of the connections we recommend reinforcing the welding brackets 1 2 with co...

Страница 5: ...ditional electric lock has to be installed Furthermore the rear connecting bracket has to be very strong or supported in order to limit vibrations Opening to the INSIDE Center of rotation in line with...

Страница 6: ...g bracket 1 should be reinforced with a corner plate 3 2b Installation of operator Installation after having installed the welding parts and corner plate 3 install the operator as follows Before mount...

Страница 7: ...ty must be turned off from power supply when making the electrical connections For the connection with the control unit please check the corresponding manual For the connection of diverse safety devic...

Страница 8: ...e side opening closing Warning For force adjustment please turn valves smoothly without bolting or unbolting them completely Please note that the motors are delivered with already optimal force adjust...

Страница 9: ...f 50m For lengths 50m please use decoupling methods Only double insulated cables which are suitable for under ground usage e g E YY J may be used In case that special regulations require another type...

Страница 10: ...mounting on the gate pillar column supported by gusset plate V respect a backdraft V 20mm of front and rear welding part 5 Dimensioned drawing Swing gate operator SWING 225 1 max travel285 67 67 with...

Страница 11: ......

Страница 12: ...Tousek GmbH Germany D 83395 Freilassing Traunsteiner Stra e 12 Tel 49 86 54 77 66 0 Fax 49 86 54 5 71 96 info tousek de Tousek GmbH Switzerland CH 6275 Ballwil Bahnhofstra e 14 Tel 41 0 41 448 2965 Fa...

Отзывы: