  /  E_SWING-225_42200116  /  30. 03. 2011

2.  Installation  

Swing gate operator SWING 225

2a.  Assignment of mounting points 

  

and attachment of welding parts 

Installation

 

NOTE

The mounting positions for the front (1) and rear (2) welding brackets can be seen in the following charts.
The A, B, and D distances always have to be measured from the center of rotation of the gate wing´s hinge.

For a horizontal alignment of the motor a vertical  backfill (V=20mm) has to be used between den welding parts.

Mounting positions

road surface

left gate leaf 

INSIDE 

right gate leaf

 

General installation notes

• 

before mounting make sure that the gate positions for gat e open/gate closed are defined by floor limit stops 

(4) (if this is not the case then these have to installed or as alternative you can use the Tousek  travel limiter).  

The limit shall not be made through end positions of operator   (the piston rod  must NOT be completely  driven 

to the limit – min. 5mm of spare travel) ! 

•  In order to increase the strength of the connections we recommend reinforcing the welding brackets 

(1+2)

 with corner 

plates 

(3)

. The welding brackets included in the shipment may have to be modified to adapt to different gate wings and 

columns.

•  for slim/wooden gates the front welding part 

(1)

  must not be mounted direclty on the gate. It should be placed under a 

flat steel.

•  control the robustness of the gate structure, the easy movement of gate leaves and for older gates the wearout of all 

components. Broken or worn out parts have to be repaired or replaced.

•  *) Attention: in order to avoid dirt and to ensure a reliable long term use, a minimum distance of 

400mm to the passage 

way should be foreseen.

•  The mounting positions for the 

front (1) and rear (2) welding brackets

 can be seen in the following charts.

 

For a horizontal alignment of the motor a vertical  backfill (V=20mm) has to be used between den welding parts.

1

2

1

2

1

2

3

3

4

4

4

gate pillar 

left gate leaf

min. 400mm

V

V=20mm

Содержание SWING 225 AEB/29 N

Страница 1: ...Installation and operating manual Swing gate operator SWING 225...

Страница 2: ...ment The electric motor heats up during operation Therefore the device should only be touched after it has cooled off Please make sure that no other persons are on site of the motorised gate area espe...

Страница 3: ...f the gate in the open and closed position and do normally not require the installation of an electric lock However on some installations it can be necessary to use an additional locking device e g an...

Страница 4: ...perator the piston rod must NOT be completely driven to the limit min 5mm of spare travel In order to increase the strength of the connections we recommend reinforcing the welding brackets 1 2 with co...

Страница 5: ...ditional electric lock has to be installed Furthermore the rear connecting bracket has to be very strong or supported in order to limit vibrations Opening to the INSIDE Center of rotation in line with...

Страница 6: ...g bracket 1 should be reinforced with a corner plate 3 2b Installation of operator Installation after having installed the welding parts and corner plate 3 install the operator as follows Before mount...

Страница 7: ...ty must be turned off from power supply when making the electrical connections For the connection with the control unit please check the corresponding manual For the connection of diverse safety devic...

Страница 8: ...e side opening closing Warning For force adjustment please turn valves smoothly without bolting or unbolting them completely Please note that the motors are delivered with already optimal force adjust...

Страница 9: ...f 50m For lengths 50m please use decoupling methods Only double insulated cables which are suitable for under ground usage e g E YY J may be used In case that special regulations require another type...

Страница 10: ...mounting on the gate pillar column supported by gusset plate V respect a backdraft V 20mm of front and rear welding part 5 Dimensioned drawing Swing gate operator SWING 225 1 max travel285 67 67 with...

Страница 11: ......

Страница 12: ...Tousek GmbH Germany D 83395 Freilassing Traunsteiner Stra e 12 Tel 49 86 54 77 66 0 Fax 49 86 54 5 71 96 info tousek de Tousek GmbH Switzerland CH 6275 Ballwil Bahnhofstra e 14 Tel 41 0 41 448 2965 Fa...

Отзывы: