STEP • 12
STEP • 13
10
= Drill Points using
screws provided as shown
= Drill Points using
screws provided as shown
x2
4.0 x 70mm
Per Floor Section
x3
x2
4.0 x 70mm
Per Floor Section
x3
x3
x3
4.0 x 70mm
4.0 x 70mm
Per Door Panel
Per Panel Edge
3ft WINDOW PANELS
FRONT DOOR PANEL
FRONT DOOR PANEL
Attach Door Front Panel
(4ft Door Panel)
DID YOU KNOW?
Door panels can be placed anywhere
a 4ft panel is, this counts for window
panels too.
12a.
Now place the 4ft Door Panel as
shown. Fix together with screws to the
right side panel framework.
FRONT WINDOW
PANELS
Attach Last Front Panel
(2ft + 3ft Door Panel)
13a.
Place the final front panel
as shown (Below) to complete
the outer framework. Then adjust
and screw down the panels to
the shed floor to make the build
secure. This requires an extra 3x
Screws.
13b.
Make sure all panels are
straight and screwed down firmly
to each other to strengthen
the outer framework before
continuing.