STEP • 18
STEP •19
13
PENT ROOF OVERHANGS
= Drill Points using
screws provided as shown
= Drill Points using
screws provided as shown
x2
4.0 x 70mm
Per Floor Section
x3
x2
4.0 x 70mm
Per Floor Section
x3
x4
x2
4.0 x 70mm
4.0 x 70mm
Per Overhang
Per Add-On
PENT ADD-ON
PENT ROOF
OVERHANGS
Place First Overhang
Section. Repeat for all
Roof Overhangs
(2ft, 3ft, 4ft)
18a.
Place the 2ft Roof Overhang into
the clearing between the 2ft Window
Panel and 2ft Roof panel. This should fit
between the frame work.
18b.
Screw the Frame work of the
overhang into the roof panel frame work
from inside of the Summer shed.
INFORMATION
The Roof overhangs only fit into the clearance
above the front panel that corrisponds with the
same sized overhang.
PENT ROOF ADD-ON
Fix Both Add-ons
Inplace. (Left and Right)
19a.
Place the Add-on touchin the
appropriate side of the Roof Overhang
(See Diagram below).
19b.
Use Screws to secure the Add-ons
to the Overhangs, making sure taht they
sit flush to the front of the overhang.