3 Tests and Diagnostics
3.12 Async Test
PORTEGE M300 Maintenance Manual (960-504)
3-27
3.12 Async Test
To execute the Async Test, select
7
from the DIAGNOSTIC TEST MENU, press
Enter
and
follow the directions displayed on the screen. Move the highlight bar to the subtest you want to
execute and press
Enter
.
Subtest 01 and 02 require the following data format:
Method:
Asynchronous
Speed:
38400BPS
Data:
8 bits and one parity bit (EVEN)
Data pattern: 20h to 7Eh
Subtest 01
FIR/SIR Point to point (send)
NOTE:
To execute subtests 01 and 02, each computer must have access to the other
computer’s infrared port.
This subtest sends 20h through 7Eh data to the receive side, then receives the sent
data and compares it to the original data through the FIR/SIR port.
Subtest 02
FIR/SIR Point to point (receive)
This subtest is used with subtest 01 described above. This subtest receives the data
from the send side, then sends the received data through the FIR/SIR port.
Subtest 03
Wraparound (on board)
NOTE:
To execute this subtest, an RS-232C wraparound connector must be connected to
the RS-232C port.
This subtest checks the data send/receive function through the wraparound
connector.
Содержание Portege M300
Страница 1: ...Toshiba Personal Computer PORTEGE M300 Maintenance Manual TOSHIBA CORPORATION File Number 960 504 ...
Страница 10: ...x PORTEGE M300 Maintenance Manual 960 504 ...
Страница 43: ...Chapter 2 Troubleshooting Procedures ...
Страница 44: ...2 Troubleshooting Procedures 2 ii PORTEGE M300 Maintenance Manual 960 504 ...
Страница 49: ...2 Troubleshooting Procedures PORTEGE M300 Maintenance Manual 960 504 2 vii ...
Страница 106: ...PORTEGE M300 Maintenance Manual 960 504 3 i Chapter 3 Tests and Diagnostics ...
Страница 107: ...3 ii PORTEGE M300 Maintenance Manual 960 504 ...
Страница 110: ...PORTEGE M300 Maintenance Manual 960 504 3 v 3 32 1 Function Description 3 94 3 32 2 Accessing the SETUP Program 3 96 ...
Страница 112: ...PORTEGE M300 Maintenance Manual 960 504 3 vii ...
Страница 118: ...3 2 Executing the Diagnostic Test 3 Tests and Diagnostics 3 6 PORTEGE M300 Maintenance Manual 960 504 ...
Страница 226: ...3 32 SETUP 3 Tests and Diagnostics 3 110 PORTEGE M300 Maintenance Manual 960 504 ...
Страница 227: ...Chapter 4 Replacement Procedures ...
Страница 228: ...4 Replacement Procedures 4 ii PORTEGE M300 Maintenance Manual 960 504 ...
Страница 232: ...4 Replacement Procedures 4 vi PORTEGE M300 Maintenance Manual 960 504 ...
Страница 313: ...Appendices ...
Страница 314: ...Appendices App ii PORTEGE M300 Maintenance Manual 960 504 ...
Страница 320: ...Appendices App viii PORTEGE M300 Maintenance Manual 960 504 ...
Страница 326: ...Appendix A Handling the LCD Module A 6 PORTEGE M300 Maintenance Manual 960 504 ...
Страница 332: ...B 3 HDD FPC View FNCHD Appendix B Board Layout B 6 PORTEGE M300 Maintenance Manual 960 504 ...
Страница 358: ...C 32 CN9610 HDD I F connector 44 PIN Appendix C Pin Assignment C 26 PORTEGE M300 Maintenance Manual 960 504 ...
Страница 368: ...Appendix E Key Layout E 2 PORTEGE M300 Maintenance Manual 960 504 ...
Страница 370: ...Appendix E Key Layout E 2 PORTEGE M300 Maintenance Manual 960 504 ...
Страница 374: ...Appendix G BIOS Rewrite Procedures G 2 PORTEGE M300 Maintenance Manual 960 504 ...
Страница 376: ...Appendix G BIOS Rewrite Procedures G 2 PORTEGE M300 Maintenance Manual 960 504 ...
Страница 378: ...Appendix H EC KBC Rewrite Procedures H 2 PORTEGE M300 Maintenance Manual 960 504 ...
Страница 380: ...Appendix I Reliability I 2 PORTEGE M300 Maintenance Manual 960 504 ...