Air purging

Airtight test

After completing the refrigerant piping work, perform an airtight test. Connect a nitrogen gas cylinder and 
pressurize the pipes with nitrogen gas as follows to conduct the airtight test.

Gas leak check

Step 1....Pressurize to 

0.5 MPa

 (5 kg/cm

2

G) for 5 minutes or longer.

Step 2....Pressurize to 

1.5 MPa

 (15 kg/cm

2

G) for 5 minutes or longer.

Step 3....Pressurize to 

4.15 MPa

 (42 kg/cm

2

G) <HWT-40, 60 model> for 24 hours.

Pressurize to 

4.6 MPa

 (46 kg/cm

2

G) <HWT-80, 110 model> for 24 hours.

(However, note that when the ambient temperature differs during pressurization and after 24 hours, the pressure 
will change by approximately 0.01 MPa (0.1 kg/cm

2

G) per 1°C, so this should be compensated.)

* After the airtight test is completed, evacuate the nitrogen gas.

If the pressure drops in steps 1 through 3, check the connections for leakage.
Check for leaks with foaming liquid, etc., take steps to fix the leaks such as brazing the pipes again and tightening 
the flare nuts, and then perform the airtight test again.

V

L

V

H

High pressure gauge

Gauge manifold

Low pressure gauge

Nitrogen gas

Charge port

Pressure reducing

valve

CAUTION

Never use oxygen, flammable gas, or noxious 
gas for the airtight test.

Major leaks can be discovered.

Micro leaks can be 

discovered.

Air purge

With respect to the preservation of the terrestrial 
environment, adopt “Vacuum pump” to purge air 
(Evacuate air in the connecting pipes) when installing the 
unit.
• Do not discharge the refrigerant gas to the atmosphere 

to preserve the terrestrial environment.

• Use a vacuum pump to discharge the air (nitrogen, etc.) 

that remains in the set. If air remains, the capacity may 
decrease.

For the vacuum pump, be sure to use one with a backflow 
preventer so that the oil in the pump does not backflow 
into the pipe of the Air to Water Heat Pump when the 
pump stops. 
(If oil in the vacuum pump is put in an Air to Water Heat 
Pump including R32, it may cause trouble with the 
refrigeration cycle.)

 

Pressure gauge

Gauge manifold valve

Handle High

(Keep fully closed)

Compound pressure gauge

Charge hose

(For R32 or R410A only)

Vacuum pump 

adapter for backflow 

prevention

(For R32 or R410A 

only)

–101 kPa

(–76 cmHg)

Handle Low

Charge hose

(For R32 or

R410A only)

Charge port

(Valve core

(Setting pin))

Packed valve at gas side

Vacuum 

pump

23-EN

24-EN

Содержание HWT-1101HRW-E

Страница 1: ...Outdoor Unit Model name HWT 401HW E HWT 601HW E HWT 801HW E HWT 1101HW E HWT 801HRW E HWT 1101HRW E AIR TO WATER HEAT PUMP Installation Manual R32 English ...

Страница 2: ...cted only to a supply with a short circuit power Ssc greater than or equal to Ssc 1 Furthermore when similar equipment or other equipment which may cause harmonic current emissions are to be connected to the same interface point with this equipment to reduce the risk of possible problems which may be caused from addition of those harmonic current emissions it is recommended to make sure that the s...

Страница 3: ...nd removes the Air to Water Heat Pump made by Toshiba Carrier Air Conditioning Europe Sp z o o He or she has been trained to install repair maintain relocate and remove the Air to Water Heat Pump made by Toshiba Carrier Air Conditioning Europe Sp z o o or alternatively he or she has been instructed in such operations by an individual or individuals who have been trained and is thus thoroughly acqu...

Страница 4: ...ht be the burst 1 Precautions for safety Ensure that all Local National and International regulations are satisfied Read this Precautions for safety carefully before Installation The precautions described below include the important items regarding safety Observe them without fail After the installation work perform a test run to check for any problem Follow the Owner s Manual to explain how to us...

Страница 5: ...e terminals securely fix To prevent external forces applied to the terminals from affecting the terminals When the Air to Water Heat Pump cannot cool or heat water well contact the dealer from whom you purchased the Air to Water Heat Pump as refrigerant leakage is considered as the cause In the case of repair that requires refill of refrigerant ask service personnel about details of the repair The...

Страница 6: ...tem either for servicing or decommissioning it is recommended good practice that all refrigerants are removed safely When transferring refrigerant into cylinders ensure that only appropriate refrigerant recovery cylinders are employed Ensure that the correct number of cylinders for holding the total system charge is available All cylinders to be used are designated for the recovered refrigerant an...

Страница 7: ...ials with high pressure fittings made for the R32 or R410A only so that water and or dust does not enter When using existing piping refer to 15 APPENDIX 1 Existing piping Required Tools Equipment and Precautions for Use Prepare the tools and equipment listed in the following table before starting the installation work Newly prepared tools and equipment must be used exclusively Legend Conventional ...

Страница 8: ...n that is durable enough to support the weight of the Outdoor Unit Insufficient durability may cause the Outdoor Unit to fall which may result in injury Pay special attention when installing the unit onto a wall surface CAUTION Do not install the Outdoor Unit in a location that is subject to combustible gas leaks Accumulation of combustible gas around the Outdoor Unit may cause a fire Install the ...

Страница 9: ...n operation When there is an obstacle on the back side Front sides and top are free When there are obstacles on the back and top sides Front and sides are free When there is an obstacle on the front side Back sides and top are free When there are obstacles on the back and sides Front and top are free The height of the obstacle should be lower than that of the Outdoor Unit When there are obstacles ...

Страница 10: ...ain hole A Drain hole B Absorb vibration with vibration proof rubber pads Bottom plate of Outdoor Unit Do not support the Outdoor Unit only with the fixing leg Fixing leg Foundation Foundation Foundation If only the end of the fixing leg is supported it may deform Incorrect Correct Correct Support the bottom surface of the fixing leg that is in contact with and underneath the bottom plate of the O...

Страница 11: ...el Right side panel Right side claws Left side claws HWT 80 110 Rear direction Pipe cover Side direction Down direction Front direction Optional Installation Parts Locally procured HWT 80 110 HWT 40 60 Refrigerant Piping Connection CAUTION Take note of these 4 important points below for piping work 1 Keep dust and moisture away from inside the connecting pipes 2 Tightly connect the connection betw...

Страница 12: ...d use a single crescent to loosen or tighten the flare nut of the valve on the liquid side Unit N m HWT 80 110 Valve at gas side HWT 40 60 Outer dia of copper pipe Tightening torque 6 4 mm 14 to 18 12 7 mm 50 to 62 15 9 mm 68 to 82 Tightened Flare nut Loosened Wrench for work Flare nut Cap Tightened Loosened Wrench for fixing Valve at gas side CAUTION Do not put the crescent wrench on the cap The ...

Страница 13: ...pressure gauge Gauge manifold Low pressure gauge Nitrogen gas Charge port Pressure reducing valve CAUTION Never use oxygen flammable gas or noxious gas for the airtight test Major leaks can be discovered Micro leaks can be discovered Air purge With respect to the preservation of the terrestrial environment adopt Vacuum pump to purge air Evacuate air in the connecting pipes when installing the unit...

Страница 14: ...ent for replenishing refrigerant Replenish liquid refrigerant When gaseous refrigerant is replenished the refrigerant composition varies which disables normal operation Adding additional refrigerant The maximum refrigerant charge 1 8kg HWT 40 60 The refrigerant need not be reduced for a 15 meter or less refrigerant pipe HWT 80 110 The refrigerant need not be reduced for a 8 meter or less refrigera...

Страница 15: ... label using indelible ink Then place the included transparent protective sheet over the label to prevent the writing from rubbing off 3 Prevent emission of the contained fluorinated greenhouse gas Ensure that the fluorinated greenhouse gas is never vented to the atmosphere during installation service or disposal When any leakage of the contained fluorinated greenhouse gas is detected the leak sha...

Страница 16: ...Check that cabling will not be subject to wear corrosion excessive pressure vibration sharp edges or any other adverse environmental effects The check shall also take into account the effects of aging or continual vibration from sources such as compressors or fans HWT 40 60 HWT 80 110 1 Remove the service panel and the terminal cover 2 A conduit pipe can be installed through the hole for wiring If...

Страница 17: ...cable tie L Circumference of the wire mm L Diameter of the wire D mm π Cut cable tie of exessive part A CAUTION An installation fuse must be used for the power supply line of this Air to Water Heat Pump Incorrect incomplete wiring may lead to an electrical fire or smoke Prepare a dedicated power supply for the Air to Water Heat Pump This product can be connected to the mains power Fixed wire conne...

Страница 18: ...an Hydro Unit is operated for about 8 hours daily the Hydro Outdoor Units will need to be cleaned at least once every 3 months This cleaning and maintenance should be carried out by a qualified service person Failure to clean the Hydro Outdoor Units regularly will result in poor performance icing water leaking and even compressor failure 12 Air to Water Heat Pump operating conditions For proper pe...

Страница 19: ...5 to the refrigerant recovery LED display shown below Fig 2 Fig 1 Fig 2 ON OFF Slow flashing ON OFF Rapid flashing 5 Press SW02 to set D805 to rapid flashing Each time SW02 is pressed D805 is switched between rapid flashing and OFF Fig 3 D800 Yellow D801 Yellow D802 Yellow D803 Yellow D804 Yellow D805 Green or or or or or OFF or Rapid flashing OFF or Rapid flashing OFF or Rapid flashing OFF or Rap...

Страница 20: ...ch or dent is heavy be sure to use new pipes for the refrigerant piping works 2 When the existing pipe thickness is thinner than the specified Pipe diameter and thickness be sure to use new pipes for the refrigerant piping works The operating pressure of R32 is high If there is a scratch or dent on the pipe or a thinner pipe is used the pressure strength may be inadequate which may cause the pipe ...

Страница 21: ...the pipes as follows Otherwise rust may be generated when moisture or foreign matter due to condensation enters the pipes The rust cannot be removed by cleaning and new pipes are necessary Placement location Term Curing manner Outdoors 1 month or more Pinching Less than 1 month Pinching or taping Indoors Every time 39 EN 40 EN ...

Страница 22: ...2F30251001 ...

Отзывы: