Maximum Density for Capacity Chart
Bucket Capacity
1937 kg/m
3
(121 lb/ft
3
)
Heaped Bucket
2369 kg/m
3
(147 lb/ft
3
)
Struck (leveled) Bucket
Material Density Chart
Material
Density (approximate)
Caliche
1250 kg/m
3
(78 lb/ft
3
)
Clay:
Natural bed
1600 kg/m
3
(104 lb/ft
3
)
Dry
1480 kg/m
3
(93 lb/ft
3
)
Wet
1600 kg/m
3
(104 lb/ft
3
)
With gravel, dry
1420 kg/m
3
(89 lb/ft
3
)
With gravel, wet
1540 kg/m
3
(96 lb/ft
3
)
Coal:
Anthracite, broken
69 kg/m
3
(69 lb/ft
3
)
Bituminous, broken
52 kg/m
3
(52 lb/ft
3
)
Earth:
Dry, packed
1510 kg/m
3
(94 lb/ft
3
)
Wet, packed
1600 kg/m
3
(100 lb/ft
3
)
Loam
1250 kg/m
3
(78 lb/ft
3
)
Granite, broken or large
crushed
1660 kg/m
3
(104 lb/ft
3
)
Gravel:
Dry
1510 kg/m
3
(94 lb/ft
3
)
Pit run (graveled sand)
1930 kg/m
3
(120 lb/ft
3
)
Dry 13 to 51 mm (1/2 to 2
inch)
1690 kg/m
3
(106 lb/ft
3
)
Wet 13 to 51 mm (1/2 to 2
inch)
2020 kg/m
3
(126 lb/ft
3
)
Limestone, broken or crushed
1540 kg/m
3
(96 lb/ft
3
)
Sand:
Dry
1420 kg/m
3
(89 lb/ft
3
)
Wet
1840 kg/m
3
(115 lb/ft
3
)
With gravel, dry
1720 kg/m
3
(107 lb/ft
3
)
With gravel, wet
2020 kg/m
3
(126 lb/ft
3
)
Sandstone, broken
1510 kg/m
3
(94 lb/ft
3
)
Shale
1250 kg/m
3
(78 lb/ft
3
)
Slag, broken
1750 kg/m
3
(109 lb/ft
3
)
Stone, crushed
1600 kg/m
3
(100 lb/ft
3
)
Topsoil
950 kg/m
3
(59 lb/ft
3
)
Folding and Unfolding the Platform
To fold the platform, lift up on the back of it and swing it
towards the traction unit (
). When the latch contacts
the mounting plate, the platform slides down into the tube
and locks in place.
Figure 22
To unfold the platform, pull up on it until the latch releases
and then swing it out and down (
).
Figure 23
22
Содержание TX 427 22342HD
Страница 49: ...Schematics g013124 Electrical Schematic Rev B 49...
Страница 50: ...Hydraulic Schematic Rev A 50...
Страница 51: ...Notes...