27
Set Active Watering Days
Next, set the active day schedule for the watering sequence by
touching the box showing S M T W T F S or 1 2 3 4 5 6 7. The
Set Water Days screen will appear.
To select active days, touch the boxes of the desired days. An
“X” will appear, indicating the day is selected. To remove a
day, touch the box again and the “X” will disappear. We have
selected Monday, Wednesday and Friday as active days.
You can easily select or remove all days simultaneously by
pressing the All Days ON or OFF box.
To disable a start time, select All Days OFF. With no active days
assigned, the start time will be ignored.
Once you have selected the desired watering days, press OK to
return to the Starts screen.
If you decide to make no changes to the screen, press ESCAPE
to return to the Starts screen.
Set Program Priority
Next, programs will be assigned to the watering sequence and
prioritized for order of operation.
Programming The Controller – 4
Figure 25 - The Set Water Days screen.
RELEASED Version ©Toro 2006-2006
Содержание TouchNet NO-90-06
Страница 14: ...12 RELEASED Version Toro 2006 2006...
Страница 16: ...14 Golf Course Layout Example Programming The Controller 4 RELEASED Version Toro 2006 2006...
Страница 17: ...15 System and Satellite Worksheets Example Programming The Controller 4 RELEASED Version Toro 2006 2006...
Страница 32: ...30 RELEASED Version Toro 2006 2006...
Страница 34: ...32 RELEASED Version Toro 2006 2006...
Страница 46: ...44 RELEASED Version Toro 2006 2006...