in toward the valve, or pulling them out to find
the mid position.
7.
Coat all pivot points with No. 2 lithium grease or
lubricate them with 30 SAE oil.
g318521
Figure 9
1.
Spool-valve levers
2.
Mounting pin
8.
Thread a hex nut (7/16 inch) onto each of the
lower control rods (
).
9.
Coat the first 10 cm (4 inches) of threads on the
lower control rods with No. 2 lithium grease.
10.
Partially thread the lower control rods into the
upper control rod (
g318524
Figure 10
1.
Control-valve-lever
mounting pin
4.
Lower control rod
2.
Cotter pins
5.
Hex nut
3.
Control-valve lever
6.
Upper control rod
11.
Align the hole on the end of the lower control
rod (
) with the mounting pin in the
control-valve lever (
).
Note:
The lever on the control tower should be
in the center of the slot (neutral position) if the
control rods are adjusted correctly (
12.
If the lever on the control tower is not in the
center of the slot, adjust it by threading the lower
rod into or out of the upper control tube. After
each lever is adjusted, check to ensure that all
levers are aligned with each other. Readjust the
levers if necessary.
g316602
Figure 11
1.
Lever in neutral position
2.
Lever in raise position
13.
Secure the control rods to the control-valve
levers with the cotter pins (
14.
Check the control lever operation by moving the
levers to the raise and lower positions. All of
the levers should operate freely with no binding
and should be well lubricated. Readjust the
control-tube linkages if necessary.
15.
When the levers are adjusted correctly, tighten
the hex nuts on the lower control rods (
10
Содержание Reelmaster 33455
Страница 25: ...Schematics g337511 Hydraulic Schematic Rev A 25...
Страница 26: ...Notes...
Страница 28: ......