g022367
Figure 57
1.
Nylon bushings
3.
Bolt
2.
Pivot pin
4.
Remove the bolt and nut that secure the pivot
pin, and remove the pin (
).
5.
Remove the boom and pivot bracket assembly
from the center frame to access the nylon
bushings.
6.
Remove and inspect the nylon bushings from
the front and back sides of the pivot bracket
(
).
Note:
Replace any worn or damaged bushings.
7.
Place a small amount of oil on the nylon
bushings, and install them into pivot bracket
(
).
8.
Install the boom and pivot bracket assembly into
the center frame, aligning the holes (
9.
Install the pivot pin and secure it with the bolt
and nut removed in step
10.
Repeat steps
through
for the other
outer-boom section.
Adjusting the Booms to
Level
Use the following procedure to adjust the level of the
left and right booms sections when they are in the
spray position.
1.
Extend the booms to the spray position.
2.
Remove the cotter pin from the pivot pin (
g013780
Figure 58
1.
Actuator
4.
Cotter
2.
Actuator rod
5.
Pin
3.
Boom-pivot pin housing
3.
Lift up on the boom and remove the pin (
), and slowly lower the boom to the ground.
4.
Inspect the pin for any damage and replace it
if necessary.
5.
Use a wrench on the flat sides of the actuator
rod to immobilize it, then loosen the jam nut to
allow the eyelet rod to be adjusted (
g014220
Figure 59
1.
Flat on the actuator rod
5.
Eyelet adjusted
2.
Jam nut
6.
Eyelet position for
assembly
3.
Eyelet
7.
Jam nut tightened to lock
new position
4.
Jam nut loosened
56
Содержание Multi Pro 1750
Страница 17: ...g033286 Figure 6 1 Right section 4 Fresh water tank 2 Boom transport cradle 5 Operator s seat 3 Left section 17...
Страница 72: ...Schematics g028078 Sprayer System Schematic Rev DWG 125 0698 Rev B 72...
Страница 73: ...Notes...
Страница 74: ...Notes...