![Toro LT3340 Скачать руководство пользователя страница 30](http://html1.mh-extra.com/html/toro/lt3340/lt3340_operators-manual_1131935030.webp)
Identifying the Tie-Down
Points
g281268
Figure 30
1.
Front tie-down point
2.
Rear tie-down point
Hauling the Machine
•
Use full-width ramps for loading the machine onto
a trailer or truck.
•
Tie the machine down securely.
Towing the Machine
Ensure that the towing vehicle can control the
combined weight of both vehicles; refer to
Specifications (page 18)
.
Raising the Cutting Units
Whenever possible, raise and latch the cutting units
before towing the machine.
Releasing the Wheel-Motor Brakes
1.
Engage the parking brake and chock the wheels
of the towing vehicle.
2.
Chock the front wheels of the machine.
3.
Raise the platform forward; refer to
.
4.
Remove the 2 bolts 12 x 40 mm and 2 washers
12 mm stored in the platform support rails
(
).
g292366
Figure 31
1.
Bolt 12 x 40 mm and
washers 12 mm
2.
Platform support rail
5.
Connect a
rigid
tow bar between the front tow
ring of the machine and the tow vehicle (
Note:
If needed, use the rear tow ring of the
machine to position the machine to provide
clearance, and use the front tow ring to tow the
machine.
g328268
Figure 32
6.
At the right, front wheel motor brake assembly
remove the hex plug (
).
30