background image

Operation

Using the Controls

Right boom switch

—activates the compressor,

generating a flow of foam to the right boom section.

Left boom switch

—activates the compressor,

generating a flow of foam to the left boom section.

Note:

You can drop the foam simultaneously from

both boom sections.

Sight gauge

—indicates the solution level in the tank.

It is located on the side of the tank.

Foam density adjustment valve

—controls the

consistency of the foam solution. Setting the valve
to Decreasing lowers the water content, allowing
the markers to hold its shape. Setting the valve to
Increasing creates a more watery marker.

Note:

On a windy day, a watery marker consistency

may be helpful.

Pressure relief valve

—when it is in the upright

position, it relieves the pressure in the foam solution
tank.

Filling the Tank and Adjusting
the Foam Density

1. Ensure that both the left and right boom switches

located on the console are in the Off position.

The contents of the foam marker tank are under
pressure. Loosening the fittings on the tank
could result in personal injury.

Flip the pressure relief valve into the Up
position.

2. Flip the pressure relief valve to the upright position

(Figure 32). Wait until all air has escaped.

Figure 32

1.

Pressure relief valve

2.

Lid clamp

3. Pull up on the lid clamp, turn the lid 90 degrees, and

remove it from the tank.

4. Pour the proper amount water and foam concentrate

through the opening in the top of the tank according
to the manufacturer’s instructions.

Important:

Extreme pH levels

(hardness/softness) of the water will
affect the amount of foam concentrate needed.

5. Install the lid on the solution tank.

6. Ensure that the lid is positioned properly for a tight

seal and push down on the clamp lid.

7. Close the pressure relief valve.

8. For the initial operation, open the foam density

adjustment valve 1/8 to 1/4 turn (Figure 33).

14

Содержание 41228

Страница 1: ...ons Note If you are installing this kit on a machine equipped with a cab a bracket from Custom Products part number 2 15904 needs to be installed as well to eliminate the interference with the cab Not...

Страница 2: ...Install the tank compressor and mixer Bolt 3 8 x 1 inch 1 Locknut 3 8 inch 1 Mixer assembly 1 2 Flat washer 3 8 inch 2 Install the mixer tee Wiring harness 1 Hose clamp small 6 3 Plastic ties 12 Wire...

Страница 3: ...ter bracket to the right side of the vehicle above the battery Figure 1 using 4 carriage bolts 3 8 x 1 1 4 inches and 4 flange locknuts 3 8 inch Note It is easiest if you remove the battery before per...

Страница 4: ...Figure 4 1 Tank compressor assembly 3 Bolt 3 8 x 1 inch 2 Multi Pro 1200 series adapter bracket 4 Flat washer 3 8 inch Multi Pro 5600 5700 Turf Sprayer 1 Remove 4 bolts 1 4 x 1 inch and flat washers...

Страница 5: ...the cover and fasteners aside 3 Mark a 108 inch supply hose with a black marker at each end Figure 9 Figure 9 1 Compressor hose 3 To the mixer tee 2 Needle valve hose 4 Connect the marked supply hose...

Страница 6: ...rough the Workman adapter bracket and cover into the tank compressor assembly Figure 11 12 Remove the left handle and fasteners from the left side of the tank skid Save fasteners for later use 13 Moun...

Страница 7: ...ft supply hose to the left side solenoid assembly 7 Secure both hoses with small hose clamps Figure 14 For all sprayers serial number 260000001 and higher 1 At the rear of the machine mount the mixer...

Страница 8: ...plug the harness connectors into the boom solenoid assemblies Plug the connector with the blue wire to the right solenoid plug the connector with the orange wire to the left solenoid Figure 18 Figure...

Страница 9: ...of the sprayer Figure 22 A Plug the connector with the yellow blue wire into the left boom solenoid B Plug the connector with the blue green wire into the right boom solenoid Figure 22 1 Mixer tee ass...

Страница 10: ...e assembly Figure 25 Figure 25 1 Control panel 3 Foam marker switches 2 Latch 3 Remove the foam marker switch hole plugs 4 Install the 2 rocker switches into the switch panel Note Ensure that the notc...

Страница 11: ...cal 2 Fuse block 5 Completing the Installation Parts needed for this procedure 2 Boom hose 2 Grommet 2 Punched hole boom cap 2 Extension hose 2 Hose clamp large 1 Parts catalog Procedure For all spray...

Страница 12: ...the punched hole boom cap until it extends 2 to 3 inches past the cap Figure 29 8 Install the boom cap into the end of the boom pipe Figure 29 9 Lubricate the inside of the extension hose and slide it...

Страница 13: ...h the punched hole boom cap until it extends 2 to 3 inches past the cap Figure 31 Figure 31 1 Top bar boom frame 4 Hose clamp 2 Boom hose 5 Extension hose 3 Cap 6 Assembled 5 Install the boom cap onto...

Страница 14: ...Density 1 Ensure that both the left and right boom switches located on the console are in the Off position The contents of the foam marker tank are under pressure Loosening the fittings on the tank c...

Страница 15: ...justment valve completely B Operate for 2 minutes C Wait 1 minute and then check the consistency of the foam D Adjust the foam to achieve the desired consistency Maintenance Recommended Maintenance Sc...

Страница 16: ...d assembly Figure 34 1 Hose barb 4 Nozzle adapter 2 Nozzle body 5 Solenoid assembly 3 Strainer 6 Liquid hose 5 Inspect and clean strainer Replace if necessary 6 Assemble strainer and nozzle body hose...