
44
Field Acceptance Test Report
TORNATECH MODEL HFX
ELECTRIC FIRE PUMP CONTROLLER
FIELD ACCEPTANCE TEST REPORT
Complete this first section if it was not completed during the Pre-Field Acceptance test
Note: A manual or automatic start must only be executed if the motor and the pump
have been cleared to be started by their respective official service technicians.
YES
NO
1
Place the Disconnecting Means handle in the ON position.
2
Push the START pushbutton. The motor will start.
3
Verify the motor rotation:
• If the motor rotation is correct, no adjustment is required.
• To correct the motor rotation, change motor connection leads 1 and 3 (A and C) at
the run contactor
4
Verify any alarms that would appear on the digital display screen. Correct any alarm
condition.
5
Set the Cut-Out and Cut-In settings by following the ViZiTouch documentation. You
need to be logged in to modify these settings. Verify the automatic start by dropping
the system pressure below the Cut-In setting.
6
Stop the motor by pressing the “STOP” membrane button. Note: the motor will only
stop if the system pressure is above the cut-out setting.
Phase Reversal Verification
YES
NO
1
Verify or simulate phase reversal
Overcurrent Protection
Controller nameplate info Electric Motor nameplate info
FLC: __________A FLC: __________A
LRC: __________A LRC: __________A
Motor Starts
Normal Power
YES
NO
1
6 manual starts
2
6 automatic starts
3
6 Emergency Handle starts
4
1 remote/deluge valve start
Field Settings:
Cut-Out Pressure: ________
Cut-In Pressure: ________
Minimum run period timer activated? Yes: _____ Set at _____minutes.
No: _____
Sequential Start Timer? Yes: _____ Set at _____seconds.
No: _____
Содержание GFX
Страница 1: ...1 INSTALLATION AND MAINTENANCE MANUAL FOR ELECTRIC FIRE PUMP CONTROLLERS MODEL GFX ...
Страница 46: ...46 ...