POST TENSION CONCRETE 

DO NOT CUT OR DRILL THROUGH A POST TENSION CABLE

Do not disturb, bolt up, or apply load to adhesive anchors prior to the full cure of the adhesive.

 

Metal anchors and fasteners will corrode and may lose load-carrying capacity when installed in corrosive        
environments or exposed to corrosive materials. There are many environments and materials which may cause 
corrosion including ocean salt air, fire-retardants, fumes, fertilizers, preservative-treated wood, dissimilar     
metals, and other corrosive elements.

 

Finished Diameters for Rotary and Rotary Hammer Carbide Tipped Concrete Drills per ANSI B212.15

 

(Locate any post tension cables before you drill)  

 

Detailed Installation Instruction for Expansion Anchors. 

CAUTION: Anchors must be at least 6” from the edge of the slab or any seam.

 

1.  Measure Lift Placement. 

(see figure 

?) (Recommended use columns as template before drilling and  

mark holes.)

 

2. Keep the drill in a perpendicular line while drilling.

 

Let the drill do the work. Do not apply excessive pressure. Lift the drill up and down occasionally to remove  

residue to reduce binding.

 

3. Drill the hole to depth equal to the length of anchor. Note: Drilling thru concrete (recommended) will allow 
the anchor to be driven thru the bottom of foundation if the threads are damaged or if the lift will need to be 
relocated. 

(Example A.1)

 

4.For better holding power blow dust from the hole.  

(Example A.2)

 

6. Repeat Steps 4 thru 5 ( Qty x 10 )

.

 

7. Move column into place carefully.

 

8. Place flat washer and hex nut over threaded end of 3/4” x 5 1/2” wedge anchor, leaving approximately 1/16 
inch of thread exposed carefully tap anchor 

(use a hammer Example A.3)

. Do not damage threads. Tap anchor 

into the concrete until nut and flat washer are against base plate. Tighten the nut, two or three turns on         
average concrete (28-day cure). Check each anchor bolt with torque wrench set to 100 foot pounds torque.  

(Example A.4)

 

   8.1 Using the horseshoe shims provided, shim each column base as required until each column is plumb. If one 
column has to be elevated to match the plane of the other column, add shim plates. Torque anchors to 100 ft-lbs. 
Shim thickness MUST NOT exceed ½” when using the 5 ½” long anchors provided with the lift. Adjust the 
column extensions plumb.

 

   8.2 Mechanical Anchors:  Expansion anchors that have been set to the required installation torque in concrete 
will experience a reduction in pre-tension (due to torque) within several hours Re-torque the anchor to the    
initial installation torque is not recommended, or necessary.

 

   8.3 For mechanical anchors that require a specific installation torque: Failure to apply the recommended     
installation torque can result in excessive displacement of the anchor under load or premature failure of the 
anchor. These anchors will lose pre-tension after setting due to pre-load relaxation.

 

   

8.4

 If anchors do not tighten to 100 ft-lbs. installation torque, replace the concrete under each column 

base with a 4’ x 4’ x 6” thick (Recommended 4,000 PSI) 3000psi minimum concrete pad keyed under and 
flush with the top of existing floor. Allow concrete to cure before installing lifts and anchors (typically 28 
days).

 

See pictures below.

 

 

 

Содержание QJY240C

Страница 1: ...anual Item T9000 2BP 22 Model QJY240C 2 Post Light Duty Automotive Equipment Lift Symmetric Floor Plate Maximum Lifting Capacity 9 000 lbs PLEASE READ ENTIRE MANUAL PRIOR TO INSTALLATION VERSION 1 10...

Страница 2: ...y Carefully inspect the unit on a regular basis and perform all maintenance as required Service and maintain the unit only with authorized or approved replacement parts Keep all instructions permanent...

Страница 3: ...escribed in the Installation Instructions section of this manual Failure by the owner to provide the recommended shelter mounting surface electrical supply and ceiling height could result in unsatisfa...

Страница 4: ...fect not interfering with equipment functionality or any Incidental indirect or consequential loss damage or expense that may result from any defect failure or malfunction of a product delay in perfor...

Страница 5: ...grease and oil spills immediately When the lift is being lowered make sure everyone is standing at least six feet away Be sure there are no jacks tools equipment left under the lift before lowering A...

Страница 6: ...l or installation of heavier parts can change the vehicle s center of gravity on the lift resulting in a critical load shift The vehicle may then be unstable Plan ahead for this possibility to insure...

Страница 7: ...ed or malfunctioning Only qualified technicians should service the lift Replace damaged components with manufacturer s certified parts 11 Keep the area around the lift clean and free of debris 12 Use...

Страница 8: ...ke sure all operators read this manual Manufacturer will assume no liability for loss or damage of any kind expressed or implied resulting from improper installation or use of this product Do not atte...

Страница 9: ...9...

Страница 10: ...itioning blocking bleeding down etc If this is a lockable device the authorized lockout person places the assigned padlock on the device to prevent its unintentional reactivation An appropriate tag is...

Страница 11: ...n a thorough inspection before it is put back into service Factors such as abrasion wear fatigue corrosion improper winding and kinking are often of greater significance in determining if a wire rope...

Страница 12: ...Anchor Products and must be followed carefully These general instructions are in addition to the specific design and installation instructions and notes provided for each particular product all of wh...

Страница 13: ...Place flat washer and hex nut over threaded end of 3 4 x 5 1 2 wedge anchor leaving approximately 1 16 inch of thread exposed carefully tap anchor use a hammer Example A 3 Do not damage threads Tap an...

Страница 14: ...se a hammer drill with a Carbide tip 3 4 diameter solid drill bit The bit tip diameter should be to ANSI Standard B95 12 1977 2003 and 2006 IBC compliant high performing medium duty expansion anchor E...

Страница 15: ...and or oil foaming up Check that oil used meets the specification in the Installation Instruction section of this manual Tighten all suction line fittings Not enough oil in tank and air has been trans...

Страница 16: ...s in your shop is critical in preventing employee injuries and damage to customer s vehicles Automotive lifts should always be used safely This will help increase the profitability productivity and sa...

Страница 17: ...a short chalk line in the area where lift will be located Draw a second chalk line at 90 to locate the positions of both lift columns Refer to lift dimensions on this page Keep thismanualwith lift at...

Страница 18: ...sonry Drill Bit Lifting Devices Use proper lifting devices such as Cranes or a Forklift 4 x 4 Wooden Blocks use for unpacking List of items included in shipment 1 Powerside Column 1 Non Powerside Colu...

Страница 19: ...devices cranes or a forklift to lift off of shipping brackets STEP 4 Slide each carriage 60 70 towards top of columns to expose base of cylinders Open the oil port of each cylinder by unscrewing the b...

Страница 20: ...afety latches There is one safety latch on each lifting carriage Once carriages raise the safety release latch will flip over This will engage the safety lock when lowered To lower lift raise carriage...

Страница 21: ...chor to be driven thru the bottom of slab if the threads are damaged or if the lift will need to be relocated See Foundation Anchoring Requi rements a ndAnchoringTip Instructions pages 12 14 STE P 11...

Страница 22: ...ave and replace sheave on roll pin The cable must be routed down the back of the column through the top of the carriage Route cable through lifting to bottom sheave E Wrap the cable through bottom she...

Страница 23: ...23 Fig 12 Fig 12...

Страница 24: ...d F Connect the long hose to the non power side fitting G Secure hose Important Make sure hose does not touch equalizing cable under Base Plate Fig 15 Steps 18 A G STEP 19 Remove the vent plug from th...

Страница 25: ...each circuit with time delay fuse or circuit breaker 208v 230v single phase 60 Hz 20 amp Verify that wiring must comply with local code Description Purpose Safety Release Handle Used to release safet...

Страница 26: ...need to be adjusted once installed on lifting carriages Position the lifting arms on the carriages using the included securing arm pins Check for proper engagement of the arm restraints arm lock and...

Страница 27: ...24 Raise lift and LISTEN You will hear the latches begin to hit and release as the lift is being raised After 3 or 4 clicks you will hear the latches synchronizing at the same time If the safety latc...

Страница 28: ...matically Post Installation Procedure Verify columns are properly shimmed and plumb Check that expansion anchors are tightened to 100 ft lbs torque Roll pins sheave pins properly attached Lifting carr...

Страница 29: ..._______________________________________________________________ ______________________________________________________________________________ _________________________________________________________...

Страница 30: ..._______________________________________________________________ ______________________________________________________________________________ _________________________________________________________...

Страница 31: ..._______________________________________________________________ ______________________________________________________________________________ _________________________________________________________...

Страница 32: ...34 Parts Diagram...

Страница 33: ...35 Parts List...

Страница 34: ...36 COMPANY INFO BACK PAGE...

Отзывы: