
15
Start
-
up Procedure
Before the
WOW RO System
is operational, it must be properly primed by removing all air from
the system.
Starting the WOW RO System:
A. Make sure the RO faucet and refrigerator ball valve (isolation valve) is CLOSED.
B. Turn the Primary Shut
-
Off Valve and Emergency Shut
-
Off Valve on. Notice the sound of water
filling the system.
C. Within 3
-
4 minutes, the waste line from the system will open with a noticeable exhaust of air
and water.
D. After waiting another minute, open the RO faucet. Notice air/water exhausting from faucet
port. Wait for a steady stream of water and then CLOSE the faucet. (Refrigerator isolation
valve still closed).
E. Within 2 minutes, the waste port will open again with a shot of air/water exhausting. This can
be witnessed by by
-
passing the drain saddle and directing the flow of the
“
D
”
line into a buck-
et. If the waste line stops within 2 to 3 minutes, repeat Step D & E, until the flow from drain is
steady. If not, check for leaks on FA Line. You should notice a solid flow from the
“
D
”
Line.
Place the tube back into Drain Saddle. System should fill to a full status within 45 to 90
minutes. (See Note 1).
F. The system should be full, indicated by no audible or visible drain flow. Open the RO faucet
and empty the system to a trickle. (Refrigerator isolation valve still in closed position).
G. Turn off the RO faucet and let the water make
-
up process refill the tank.
H. Repeat this process (Steps F & G)
three (3) times
to completely prep and flush the filter car-
tridges and ensure the operation of the system is stabilized. The refrigerator/icemaker ball
valve (isolation valve) must be closed during this process and can only be opened when system
is full for the final time. Next, you must follow procedures for bleeding lines, (Page 18).
I. System is now fully operational! If the system does not work, refer to Troubleshooting Guide,
(Page 37).
J. To insure the highest quality water, it is recommended to drain the system once a week.
Note 1:
If your connections along any FA lines have a leak (even one drop), the system will not work. Repair the
leak and repeat Start
-
up Procedure.
Note 2:
See Pages 16
-
23 if adding any appliances.
Note 3:
Unlike traditional
air charged RO systems, the WOW RO System will always have water in the tank, empty or full.
Step 5
Installation Steps and Start
-
Up Procedures
Содержание 20-209-001
Страница 3: ...3 Figure 1 Installation Diagram...
Страница 7: ...7 Section 1 Installation Start up Procedures...
Страница 10: ...10 Installation Kit Contents A B C D E F G H I G Optional Air Gap Faucet or Non Air Gap Faucet...
Страница 22: ...22 Figure 7 Refrigerator Icemaker...
Страница 29: ...29 Parallel Processing...
Страница 30: ...30 Section 5 Plumbing the Sink...
Страница 34: ...34 Section 6 Maintenance...
Страница 40: ...40 Section 7 Troubleshooting...
Страница 45: ...45 Customer Service Notes Service Details Name Phone Installer Dealer Date Notes...
Страница 48: ...48...