background image

www.crescentindustrial.co.uk

EX30-OCS

12.WARRANTY CONDITIONS

 

 

In accordance with the Metaalunie Conditions, the machine has a warranty period of six months 
after delivery. This means that, during this period, material and manufacturing defects will only be 

repaired free of charge 

AFTER THEY HAVE BEEN ASSESSED BY A QUALIFIED TOPFLOOR ENGINEER’

Transportation/travelling expenses shall be for the purchaser’s account. 

The warranty DOES NOT cover defects caused as a result of: 
•  demonstrable overloading of the machine. 
•  using the machine for purposes for which it is not built. 
•  demonstrable poor maintenance. 
•  not properly following the instructions in this manual. 
•  the use of the machine by unauthorised people. 
•  repairing the machine using non-OEM parts 
•  modifying the machine without obtaining written permission from TOPFLOOR

The warranty DOES NOT cover parts subject to wear as referred to in Section 5.

13. REPAIRS 

The machine has a simple construction and parts diagrams are available on our website. Repairs 
may only be carried out by competent, experienced personnel! This manual does not contain 
detailed descriptions of repair procedures. If you have any questions or wish to have repairs carried 
out by professionals, you can always contact TOPFLOOR.

14. END OF SERVICE LIFE 

You must always comply with current local requirements and guidelines for working safely and 
the responsible disposal of worn out machines! After the machine has been in use for a long time 
and reached the end of its technical service life, follow the disposal procedure below:

•  Clean the machine. 
•  Dismantle electrical components so they can be sent for recycling. 
•  Dismantle the plastic components so they can be handed in as separated waste. 
•  The remaining steel components can be sent for scrap.

Follow the ECMR (European Cleaning Machines Recycling) guidelines; 
go to www.ecmr.nu for more information. 

Содержание EX30-OCS

Страница 1: ...EX30 OCS www crescentindustrial co uk Operator s manual English...

Страница 2: ...he prior written permission of Crescent Industrial This also applies to all accompanying drawings and diagrams Crescent Industrial shall retain the right to modify machine components at any time with...

Страница 3: ...GENERAL 09 6 2 SPECIFIC SAFETY INSTRUCTIONS 10 7 STORAGE 11 8 TRANSPORT 12 9 GETTING DOWN TO WORK 12 9 1 PRELIMINARY CHECKS 12 9 2 GETTING DOWN TO WORK 12 9 3 BALLAST PLATES ADDITIONAL WEIGHT 12 10 MA...

Страница 4: ...operation maintenance and servicing These people must Possess the necessary level of knowledge and qualifications to do their work Have read and understood this user manual Follow all given safety ins...

Страница 5: ...er The machine is pre assembled on delivery and is completely ready for carrying out scrubbing buffing polishing work Make sure you know how to do this work before you start using the machine On deliv...

Страница 6: ...d A large size eccentric electric motor that drives the pad holder is mounted on the frame When in operation the machine is guided over the floor on a wheelset by pushing a stainless steel shaft endin...

Страница 7: ...R disclaims all responsibility in advance for damage caused as a result of any use other than described above WARNING These machines do NOT comply with ATEX requirements and may NOT be used in an ATEX...

Страница 8: ...tion depends largely on the surface on which and the space in which it is used Spatial echo can lead to significantly higher noise levels In these situations Topfloor advises making hearing protection...

Страница 9: ...y tools WARNING Almost all accidents are the result of reduced concentration inadvertence negligence or misjudgement Be sure to work slowly and carefully 6 1 General WARNING Improper use or operating...

Страница 10: ...Topfloor or your local dealer ATTENTION Verify that the switch is set to OFF before inserting the machine s plug in the power socket Move the machine carefully over steps stairs ATTENTION The machine...

Страница 11: ...ealth and safety regulations must always be followed All forms of improper use must be avoided During the warranty period a service technician approved by Topfloor may work on the machine ATTENTION Be...

Страница 12: ...hed Check that at least one set of weights is installed but no more than six sets The number of weights on the left and right hand side of the motor must be equal 9 2 Getting down to work Move the mac...

Страница 13: ...ng agents wipe the machine down with a damp cloth to prevent corrosion of the stainless steel components Check for loose nuts and bolts 10 2 2 Monthly Check whether the plate under the pad holder stil...

Страница 14: ...aced The eccentric bearing is worn Ensure that it is replaced Proceed as follows Switch the machine off Remove the plug from the power socket Put the handle in the highest position Tip the machine bac...

Страница 15: ...OES NOT cover parts subject to wear as referred to in Section 5 13 REPAIRS The machine has a simple construction and parts diagrams are available on our website Repairs may only be carried out by comp...

Страница 16: ...address at Crescent Industrial Ltd We TOPFLOOR Industrial Floor Cleaning Machines Crescent Industrial Berrington House Berrington Road Leamington Spa CV31 1NB Declare under our sole responsibility tha...

Страница 17: ...Crescent Industrial Ltd...

Отзывы: