www.crescentindustrial.co.uk
EX30-OCS
8. TRANSPORT
The basic machine weighs approximately 16 kilos and it can be lifted by one person.
9. GETTING DOWN TO WORK!
9.1 Preliminary checks
You are working with (scrub) water and a 220 V machine. Make sure that:
• The mains voltage is 220 V
• The earth connection functions properly
• A GFCI (Ground Fault Circuit Interruptor) is installed.
- Check the cables for damage: both the short power cable as well as the extension cord!
- If you detect any deviations: solve these first before you start to work!
- Before starting treatment with the EX30-OCS, examine the floor on colour
and shape retention.
- Before you start, check if the correct pad for the job is attached.
- Check that at least one set of weights is installed, but no more than six sets!
- The number of weights on the left and right-hand side of the motor must be equal!
9.2 Getting down to work!
• Move the machine to the location where it will be used.
• Adjust the handle to a suitable working height and make sure it is locked properly in position!
• Check whether the switch is set to OFF.
• Unwind the extension cable (if used) completely and insert the machine’s plug into
an earthed power socket.
• Push the switch to ON position. The motor will start and the pad will start to work.
• While working the machine, you can easily push it around in any direction without requiring
a large amount of force. Work in straight lines, not by moving the machine from left to right.
• Always switch off the machine immediately after stopping work so you do not damage
the floor. Remove the plug from the power socket.
Содержание EX30-OCS
Страница 1: ...EX30 OCS www crescentindustrial co uk Operator s manual English...
Страница 17: ...Crescent Industrial Ltd...