background image

www.crescentindustrial.co.uk

EX30-OCS

8. TRANSPORT

 

 

The basic machine weighs approximately 16 kilos and it can be lifted by one person.

9. GETTING DOWN TO WORK!

9.1  Preliminary checks

You are working with (scrub) water and a 220 V machine. Make sure that: 
• The mains voltage is 220 V 
• The earth connection functions properly 
• A GFCI (Ground Fault Circuit Interruptor) is installed.

- Check the cables for damage: both the short power cable as well as the extension cord! 
- If you detect any deviations: solve these first before you start to work! 
- Before starting treatment with the EX30-OCS, examine the floor on colour  
  and shape retention. 
- Before you start, check if the correct pad for the job is attached. 
- Check that at least one set of weights is installed, but no more than six sets! 
- The number of weights on the left and right-hand side of the motor must be equal!

9.2  Getting down to work!

•  Move the machine to the location where it will be used. 
•  Adjust the handle to a suitable working height and make sure it is locked properly in position! 
•  Check whether the switch is set to OFF. 
•  Unwind the extension cable (if used) completely and insert the machine’s plug into  
    an earthed power socket.
 
•  Push the switch to ON position. The motor will start and the pad will start to work. 
•  While working the machine, you can easily push it around in any direction without requiring  
   a large amount of force. Work in straight lines, not by moving the machine from left to right. 
•  Always switch off the machine immediately after stopping work so you do not damage  
   the floor. Remove the plug from the power socket.

Содержание EX30-OCS

Страница 1: ...EX30 OCS www crescentindustrial co uk Operator s manual English...

Страница 2: ...he prior written permission of Crescent Industrial This also applies to all accompanying drawings and diagrams Crescent Industrial shall retain the right to modify machine components at any time with...

Страница 3: ...GENERAL 09 6 2 SPECIFIC SAFETY INSTRUCTIONS 10 7 STORAGE 11 8 TRANSPORT 12 9 GETTING DOWN TO WORK 12 9 1 PRELIMINARY CHECKS 12 9 2 GETTING DOWN TO WORK 12 9 3 BALLAST PLATES ADDITIONAL WEIGHT 12 10 MA...

Страница 4: ...operation maintenance and servicing These people must Possess the necessary level of knowledge and qualifications to do their work Have read and understood this user manual Follow all given safety ins...

Страница 5: ...er The machine is pre assembled on delivery and is completely ready for carrying out scrubbing buffing polishing work Make sure you know how to do this work before you start using the machine On deliv...

Страница 6: ...d A large size eccentric electric motor that drives the pad holder is mounted on the frame When in operation the machine is guided over the floor on a wheelset by pushing a stainless steel shaft endin...

Страница 7: ...R disclaims all responsibility in advance for damage caused as a result of any use other than described above WARNING These machines do NOT comply with ATEX requirements and may NOT be used in an ATEX...

Страница 8: ...tion depends largely on the surface on which and the space in which it is used Spatial echo can lead to significantly higher noise levels In these situations Topfloor advises making hearing protection...

Страница 9: ...y tools WARNING Almost all accidents are the result of reduced concentration inadvertence negligence or misjudgement Be sure to work slowly and carefully 6 1 General WARNING Improper use or operating...

Страница 10: ...Topfloor or your local dealer ATTENTION Verify that the switch is set to OFF before inserting the machine s plug in the power socket Move the machine carefully over steps stairs ATTENTION The machine...

Страница 11: ...ealth and safety regulations must always be followed All forms of improper use must be avoided During the warranty period a service technician approved by Topfloor may work on the machine ATTENTION Be...

Страница 12: ...hed Check that at least one set of weights is installed but no more than six sets The number of weights on the left and right hand side of the motor must be equal 9 2 Getting down to work Move the mac...

Страница 13: ...ng agents wipe the machine down with a damp cloth to prevent corrosion of the stainless steel components Check for loose nuts and bolts 10 2 2 Monthly Check whether the plate under the pad holder stil...

Страница 14: ...aced The eccentric bearing is worn Ensure that it is replaced Proceed as follows Switch the machine off Remove the plug from the power socket Put the handle in the highest position Tip the machine bac...

Страница 15: ...OES NOT cover parts subject to wear as referred to in Section 5 13 REPAIRS The machine has a simple construction and parts diagrams are available on our website Repairs may only be carried out by comp...

Страница 16: ...address at Crescent Industrial Ltd We TOPFLOOR Industrial Floor Cleaning Machines Crescent Industrial Berrington House Berrington Road Leamington Spa CV31 1NB Declare under our sole responsibility tha...

Страница 17: ...Crescent Industrial Ltd...

Отзывы: