SOL-96.110.061 / 031221
TOPAZ Manganese
Startup
26
5
Wait until the photometer has been filled with fresh water. Then
set “SV Filling” to <OFF>.
6
Open the <PUMPS> tab.
7
Press the <ON> button next to “P1 - hydroxylamine”.
8
Let the pump run until the fluid has reached the photometer and
there is no more air in the tube.
This takes approximately 2.5 minutes. The pump stops
automatically.
9
Repeat steps 3–4 with pumps “P2 - triethanolamine 20%",
"P3 - NH3 Buffer pH9.2", "P7 - PAN Triton X - 1", "P8 - Cyanides
25g/L" and "P9 - Sulfuric acid".
ON
ON
OFF
OFF
P1 - hydroxilamine
P2 - triethanolamine 20%
P3 - NH3 Buffer pH9.2
P7 - PAN Triton X - 1
ACTUATOR
4-20mA OUTPUT
PUMPS
RELAYS
INPUTS
ON
ON
OFF
OFF
P8 - Cyanides 25g/L
ON
OFF
P9 - Sulfuric acid
ON
OFF