22
If you increase the length of the leads, be aware that possible damage may occur with excessively long or incorrectly sized leads.
•
Connect the TIG TORCH to the negative (-) quick-connection terminal, and turn clockwise to tighten.
•
Connect the earth lead connector to the positive (+) quick-connection terminal and turn clockwise to tighten.
•
Connect gas lines as required.
•
Select Lift TIG function on power source.
•
Select required parameters on power source by pressing control dial and turning clockwise or anticlockwise.
•
Connect earth lead to the work-piece or bench.
In order to guarantee that arc welding machine works efficiently and safely, it must be maintained regularly. Customers that understand
the maintenance schedule and how to maintain the welding plant , are able to carry out a simple examination and preventative
maintenance of the welding plant to potentially reduce the chance of faults and to lengthen the service life of their welding plant.
Maintenance items in detail are in the following table.
•
Warning: For safety while maintaining the machine, please shut off the supply power and wait for at least 5 minutes before carrying
out the below:
DATE
MAINTENANCE SHEDULE AND PROCEDURE
DAILY
•
CHECK CONDITION OF SWITCHES AND DIALS AND CHECK FOR CORRECT OPERATION.
•
TURN POWER ON AND CHECK FOR VIBRATIONS, STRANGE SMELLS OR STRANGE NOISES.
•
OBSERVE THE FRONT PANEL INDICATOR LIGHTS AND ENSURE THEY ARE FUNCTIONING CORRECTLY AND THE
DISPLAYS ARE NOT DISPLAYING AN ERROR CODE.
•
CHECK FOR NORMAL OPERATION OF THE FAN WHEN MACHINE IS UNDER LOAD.
•
CHECK CONDITION AND FITMENT OF ALL LEADS AND CABLES AND ENSURE MECHANICAL CONNECTIONS ARE
FIRMLY IN PLACE.
•
ENSURE THERE IS NO VISIBLE DAMAGE TO THE POWER INPUT AND OUTPUT CABLES OR EARTH LEAD.
MONTHLY •
USING ONLY DRY AND CLEAN AIR, BLOW THE MACHINE OUT PAYING SPECIAL CARE TO NOT ROTATE THE
FAN IN THE INCORRECT DIRECTION OF TRAVEL, AND TRY TO NOT DIRECTLY BLOW HIGH PRESSURE AIR
DIRECTLY AT COMPONENTS.
QUARTER-
LY
•
IF REQUIRED, HAVE MACHINE INSPECTED AND CALIBRATED TO ENSURE DISPLAYED OUTPUT CURRENT
MATCHES THE ACTUAL CURRENT OUTPUT OF THE MACHINE.
(THIS SHOULD BE CARRIED OUT BY AN AUTHORIZED TECHNICIAN.)
YEARLY
MEASURE THE INSULATING IMPEDANCE OF THE MAIN CIRCUIT, PCB AND CASE. IF BELOW 1M
Ω
,
INSULATION MAY BE DAMAGED AND IN NEED OF REPLACEMENT TO ENSURE CORRECT INSULATION.
LIFT TIG
MAINTENANCE
Содержание 351 SWF
Страница 1: ...TOPGUNWELDING COM AU Manual Guide 351 SWF 505 SWF 3 PHASE MIG WELDER W FEEDER...
Страница 2: ...This page has been intentionally left blank...
Страница 4: ...2...
Страница 18: ...16 Basic Wiring Diagram Power Source...
Страница 26: ...24 Electrical Schematic DIAGRAM...
Страница 30: ...28...
Страница 31: ...29...
Страница 32: ......